  "dataset": "smr_projects",
  "as_of_date": "2026-10-09",
  "generated_at": "2026-10-09T00:51:21Z",
  "description": "Small modular and advanced reactor projects worldwide with a named site or regulatory filing (plus a few programme-level concepts named in the Nuclear Atlas brief): design, developer, site, status, licensing stage, capacity, fuel, as verified against web sources on 2026-10-09. Every record cites its primary source and as-of date; unknown values are null with a note.",
  "sources": [
    {
      "name": "World Nuclear News (WNN)",
      "url": "https://www.world-nuclear-news.org/",
      "accessed": "2026-10-09",
      "licence": "Copyright WNA; facts cited"
    },
    {
      "name": "NucNet",
      "url": "https://www.nucnet.org/",
      "accessed": "2026-10-09",
      "licence": "Copyright; facts cited"
    },
    {
      "name": "ANS Nuclear Newswire",
      "url": "https://www.ans.org/news/",
      "accessed": "2026-10-09",
      "licence": "Copyright; facts cited"
    },
    {
      "name": "US NRC",
      "url": "https://www.nrc.gov/",
      "accessed": "2026-10-09",
      "licence": "US public domain"
    },
    {
      "name": "US DOE",
      "url": "https://www.energy.gov/",
      "accessed": "2026-10-09",
      "licence": "US public domain"
    },
    {
      "name": "CNSC",
      "url": "https://www.cnsc-ccsn.gc.ca/",
      "accessed": "2026-10-09",
      "licence": "Crown copyright, open"
    },
    {
      "name": "ONR",
      "url": "https://www.onr.org.uk/",
      "accessed": "2026-10-09",
      "licence": "Open Government Licence"
    },
    {
      "name": "GOV.UK",
      "url": "https://www.gov.uk/",
      "accessed": "2026-10-09",
      "licence": "Open Government Licence"
    },
    {
      "name": "World Nuclear Association country profiles",
      "url": "https://world-nuclear.org/information-library/",
      "accessed": "2026-10-09",
      "licence": "Copyright WNA; facts cited"
    },
    {
      "name": "Developer press releases (GE Vernova, TerraPower, Kairos, Rolls-Royce SMR, NANO Nuclear, Blue Energy, Saskatchewan Gov)",
      "url": "various (see records)",
      "accessed": "2026-10-09",
      "licence": "Copyright; facts cited"
    },
    {
      "name": "Nuclear Engineering International",
      "url": "https://www.neimagazine.com/",
      "accessed": "2026-10-09",
      "licence": "Copyright; facts cited"
    },
    {
      "name": "Foro Nuclear",
      "url": "https://www.foronuclear.org/",
      "accessed": "2026-10-09",
      "licence": "Copyright; facts cited"
    }
  ],
  "fields": {
    "project_id": "slug; unique",
    "design": "reactor design name",
    "design_family": "iPWR | BWR-SMR | HTGR | SFR | MSR | LFR | microreactor | floating",
    "developer": "technology vendor / developer",
    "developer_country_iso3": "ISO 3166-1 alpha-3 of the developer HQ",
    "site_name": "named site, or null when none announced",
    "site_country_iso3": "ISO3 of the site country (or intended market when no site)",
    "lat": "site latitude (WGS84); null when no site is named or coordinates not verified; precision stated in notes",
    "lon": "site longitude (WGS84)",
    "capacity_mwe_per_module": "net/gross MWe per module as stated by developer (see notes)",
    "modules_planned": "number of reactor modules in the project phase recorded",
    "capacity_mwe_total": "capacity_mwe_per_module x modules_planned (or developer total)",
    "status": "concept | pre_licensing | licence_application | licensed | under_construction | operating | cancelled | on_hold (definitions in docs/data/smr_projects.md)",
    "regulator": "national regulator (or DOE for US Reactor Pilot Program authorisations)",
    "regulator_stage": "free text, latest verified licensing step with date",
    "key_milestone_date": "ISO date of the latest verified milestone",
    "target_operation_year": "developer/owner stated target; null when none",
    "fuel": "LEU | LEU+ | HALEU | TRISO-HALEU | other | null (unknown)",
    "fuel_enrichment_pct": "number or null",
    "customer_or_offtaker": "owner/customer/offtaker",
    "is_floating": "bool",
    "use_case": "grid | data_centre | industrial_heat | remote | district_heating | research",
    "source_url": "primary source (developer, regulator, IAEA/WNA/WNN)",
    "source_name": "name of source",
    "as_of_date": "date the source was checked",
    "confidence": "high (primary/regulator/developer) | medium (trade press) | low (partial/unverified)",
    "notes": "caveats, coordinate precision, secondary sources"
  },
  "status_definitions": {
    "concept": "No named site and/or no regulatory filing; may include design-level regulatory engagement (e.g. NRC pre-application) and non-binding agreements.",
    "pre_licensing": "Named site; pre-application/vendor design review/early works or siting studies, but no licence application filed for the site.",
    "licence_application": "A site-specific licence application (construction permit, licence to prepare site, standard design approval for i-SMR) is docketed/under review.",
    "licensed": "Construction permit/licence (or DOE DSA authorisation) granted but safety-related construction not confirmed started.",
    "under_construction": "Safety-related/nuclear construction or on-site commissioning underway (includes test reactors awaiting fuel load).",
    "operating": "Grid-connected commercial operation, or for DOE Reactor Pilot Program test reactors: fuelled criticality achieved (zero-power unless stated).",
    "on_hold": "Construction or development suspended / vendor in administration.",
    "cancelled": "Formally cancelled."
  },
  "summary": {
    "record_count": 53,
    "by_status": {
      "concept": 7,
      "pre_licensing": 16,
      "under_construction": 10,
      "licensed": 5,
      "licence_application": 7,
      "operating": 6,
      "on_hold": 2
    },
    "by_site_country": {
      "USA": 22,
      "ROU": 1,
      "GHA": 1,
      "CAN": 5,
      "POL": 1,
      "EST": 1,
      "GBR": 2,
      "CZE": 1,
      "SWE": 2,
      "CHN": 2,
      "RUS": 3,
      "FRA": 2,
      "ARG": 1,
      "KOR": 2,
      "FIN": 1,
      "CHE": 1,
      "NLD": 2,
      "IDN": 1,
      "PHL": 1,
      "KEN": 1
    },
    "by_confidence": {
      "medium": 33,
      "low": 12,
      "high": 8
    }
  },
  "known_gaps": [
    "CAREM-25 (Argentina): no 2025-2026 status source found; record reflects Sept 2024 halt — may be stale.",
    "Reactor Pilot Program: whether Groves Isotope Test Reactor, Last Energy PWR-5, Radiant Kaleidos, Oklo Aurora-INL or Deep Fission reached criticality after 2026-07-02 is unverified.",
    "X-energy Long Mott: NRC construction permit decision pending after 2026-09-22 hearing (record closed 2026-10-06) — check for issuance.",
    "Rolls-Royce SMR GDA Step 3 completion (due Aug 2026) and UK nuclear site licence application at Wylfa not confirmed.",
    "Russia: Baimsky floating units — delivery years, per-unit MWe (106 vs 110) and site coordinates unverified; Yakutia RITM-200N unit count (1 vs 2) and target year (2028 vs 2030) conflict between NEI and WNA.",
    "Fuel enrichment is null for most records; only HTR-PM (8.5%), NuScale (4.95% design max) and Xe-100 (15.5% design) carry figures, the latter two from developer design data not re-verified today.",
    "Darlington units 2-4: no separate cost/schedule published; CAD 20.9bn provincial budget scope (unit 1 vs four units) ambiguous in sources.",
    "Coordinates: most are site-level approximations from reference knowledge, not GIS-verified; city-centroid or null where flagged in notes.",
    "Not covered (no named site or filing found in time): Oklo Pluto, Last Energy Haskell County (TX), Westinghouse AP300 UK Teesside progress, Hyundai E&C own SMR, Copenhagen Atomics 2026 experiment outcome, Saltfoss/Seaborg funding status, Ghana project-level 2026 update.",
    "ENTRA1/TVA: 'TVA board review of SMR allocation' was reported as pending for October 2026 — verify outcome.",
    "TVO/Fortum, Helen (Finland) and other European utility SMR feasibility programmes without a selected design are not recorded."
  ],
  "records": [
    {
      "project_id": "nuscale-entra1-tva-program",
      "design": "NuScale US460 (VOYGR-6, 77 MWe modules)",
      "design_family": "iPWR",
      "developer": "NuScale Power / ENTRA1 Energy",
      "developer_country_iso3": "USA",
      "site_name": null,
      "site_country_iso3": "USA",
      "lat": null,
      "lon": null,
      "capacity_mwe_per_module": 77,
      "modules_planned": null,
      "capacity_mwe_total": 6000,
      "status": "concept",
      "regulator": "NRC",
      "regulator_stage": "NRC standard design approval for uprated 77 MWe module (US460) announced 2025-05-29 and 2025-05-30; no site-specific CP/COL application filed",
      "key_milestone_date": "2025-09-04",
      "target_operation_year": null,
      "fuel": "LEU",
      "fuel_enrichment_pct": 4.95,
      "customer_or_offtaker": "Tennessee Valley Authority (non-binding collaborative agreement with ENTRA1, Sept 2025)",
      "is_floating": false,
      "use_case": "grid",
      "source_url": "https://www.world-nuclear-news.org/articles/tva-entra1-energy-team-up-for-smr-deployment",
      "source_name": "WNN 2025-09-04",
      "as_of_date": "2026-10-09",
      "confidence": "medium",
      "notes": "Up to 6 GW via six ENTRA1-owned plants across TVA's seven-state region; no sites named. Still non-binding and no PPA as of 2026-09-15 (Motley Fool/NuScale Q2-2026 call, https://www.fool.com/investing/2026/09/15/nuscale-power-is-closing-in-on-a-deal-that-could-t/). 6,000 MWe total is the programme ceiling, not a firm order. Enrichment 4.95% is the design maximum (developer design data, not re-verified today). DOE page on SDA: https://www.energy.gov/node/4851387 (2025-05-30)."
    },
    {
      "project_id": "ropower-doicesti",
      "design": "NuScale US460 (VOYGR-6)",
      "design_family": "iPWR",
      "developer": "NuScale Power",
      "developer_country_iso3": "USA",
      "site_name": "Doicești (former coal plant), Dâmbovița County",
      "site_country_iso3": "ROU",
      "lat": 44.98,
      "lon": 25.41,
      "capacity_mwe_per_module": 77,
      "modules_planned": 6,
      "capacity_mwe_total": 462,
      "status": "pre_licensing",
      "regulator": "CNCAN",
      "regulator_stage": "Licensing process ongoing after FID; no construction licence yet (WNN 2026-02-13)",
      "key_milestone_date": "2026-02-13",
      "target_operation_year": 2033,
      "fuel": "LEU",
      "fuel_enrichment_pct": 4.95,
      "customer_or_offtaker": "RoPower Nuclear (Nuclearelectrica + Nova Power & Gas/E-INFRA)",
      "is_floating": false,
      "use_case": "grid",
      "source_url": "https://world-nuclear-news.org/articles/final-investment-decision-taken-for-romanias-smrs",
      "source_name": "WNN 2026-02-13",
      "as_of_date": "2026-10-09",
      "confidence": "medium",
      "notes": "FID approved by Nuclearelectrica shareholders Feb 2026 but PM Bolojan said investment proceeds only once a funding formula is found; ~15-month pre-EPC phase to Class-2 budget. Cost cited USD 6-7bn. US EXIM LoI up to USD 3bn, DFC LoI up to USD 1bn. Coordinates: town-level (approx.)."
    },
    {
      "project_id": "nuscale-ghana-regnum",
      "design": "NuScale VOYGR-12",
      "design_family": "iPWR",
      "developer": "NuScale Power / Regnum Technology Group",
      "developer_country_iso3": "USA",
      "site_name": null,
      "site_country_iso3": "GHA",
      "lat": null,
      "lon": null,
      "capacity_mwe_per_module": 77,
      "modules_planned": 12,
      "capacity_mwe_total": 924,
      "status": "concept",
      "regulator": "Nuclear Regulatory Authority (Ghana)",
      "regulator_stage": "No licence application; Ghana in IAEA Milestones Phase 2 (Feb 2026 update)",
      "key_milestone_date": "2024-09-03",
      "target_operation_year": null,
      "fuel": "LEU",
      "fuel_enrichment_pct": 4.95,
      "customer_or_offtaker": "Nuclear Power Ghana (BOOT structure sought)",
      "is_floating": false,
      "use_case": "grid",
      "source_url": "https://www.neimagazine.com/news/ghana-secures-nuscale-smr-agreement/",
      "source_name": "NEI 2024-09-03",
      "as_of_date": "2026-10-09",
      "confidence": "low",
      "notes": "Non-binding 2024 agreement; two candidate sites identified by Ghana but not named for this project. 924 MWe = 12 x 77 MWe (calculated). Ghana targets first nuclear plant mid-2030s (Energy for Growth Hub 2026-09-17, https://energyforgrowth.org/article/2026-update-who-in-africa-is-ready-for-nuclear-power/). No 2026 project-specific update found."
    },
    {
      "project_id": "bwrx300-darlington-unit1",
      "design": "GE Vernova Hitachi BWRX-300",
      "design_family": "BWR-SMR",
      "developer": "GE Vernova Hitachi Nuclear Energy",
      "developer_country_iso3": "USA",
      "site_name": "Darlington New Nuclear Project, Clarington, Ontario",
      "site_country_iso3": "CAN",
      "lat": 43.873,
      "lon": -78.72,
      "capacity_mwe_per_module": 300,
      "modules_planned": 1,
      "capacity_mwe_total": 300,
      "status": "under_construction",
      "regulator": "CNSC",
      "regulator_stage": "Licence to Construct issued 2025-04; Licence to Operate application submitted 2026-03 (under review, hearing date TBA); hold point 1 (reactor building foundation) lifted 2026-03-30",
      "key_milestone_date": "2026-03-30",
      "target_operation_year": 2030,
      "fuel": "LEU",
      "fuel_enrichment_pct": null,
      "customer_or_offtaker": "Ontario Power Generation",
      "is_floating": false,
      "use_case": "grid",
      "source_url": "https://www.world-nuclear-news.org/articles/opg-applies-for-operating-licence-for-bwrx-300-smr",
      "source_name": "WNN 2026-04-02",
      "as_of_date": "2026-10-09",
      "confidence": "high",
      "notes": "First grid-scale SMR under construction in the West. Province approved CAD 20.9bn budget (June 2025) for the four-unit project with construction start on unit 1. Shaft excavation reached full depth (NucNet 2026-03-23). GEV press release 2026-09-29 confirms LTO application submitted March 2026. Coordinates: Darlington site."
    },
    {
      "project_id": "bwrx300-darlington-units2-4",
      "design": "GE Vernova Hitachi BWRX-300",
      "design_family": "BWR-SMR",
      "developer": "GE Vernova Hitachi Nuclear Energy",
      "developer_country_iso3": "USA",
      "site_name": "Darlington New Nuclear Project, Clarington, Ontario",
      "site_country_iso3": "CAN",
      "lat": 43.873,
      "lon": -78.72,
      "capacity_mwe_per_module": 300,
      "modules_planned": 3,
      "capacity_mwe_total": 900,
      "status": "licensed",
      "regulator": "CNSC",
      "regulator_stage": "Covered by the Darlington site licence framework; the April 2025 Licence to Construct covered unit 1 only (construction licence for units 2-4 pending)",
      "key_milestone_date": "2025-04-04",
      "target_operation_year": null,
      "fuel": "LEU",
      "fuel_enrichment_pct": null,
      "customer_or_offtaker": "Ontario Power Generation",
      "is_floating": false,
      "use_case": "grid",
      "source_url": "https://www.cnsc-ccsn.gc.ca/eng/reactors/new-reactor-power-plant-projects/new-reactor-power-plant-facilities/darlington-new-nuclear-project/",
      "source_name": "CNSC Darlington New Nuclear Project page",
      "as_of_date": "2026-10-09",
      "confidence": "medium",
      "notes": "Status 'licensed' refers to the site preparation licence (2022) covering up to 4 units; construction licence for units 2-4 not yet issued. No separate cost or schedule published for units 2-4 (WNN 2026-04-02). Coordinates: Darlington site."
    },
    {
      "project_id": "bwrx300-clinch-river-tva",
      "design": "GE Vernova Hitachi BWRX-300",
      "design_family": "BWR-SMR",
      "developer": "GE Vernova Hitachi Nuclear Energy",
      "developer_country_iso3": "USA",
      "site_name": "Clinch River Nuclear Site, Oak Ridge, Tennessee",
      "site_country_iso3": "USA",
      "lat": 35.898,
      "lon": -84.384,
      "capacity_mwe_per_module": 300,
      "modules_planned": 1,
      "capacity_mwe_total": 300,
      "status": "licensed",
      "regulator": "NRC",
      "regulator_stage": "NRC construction permit issued 2026-09-29 (first US BWRX-300 CP; CPA submitted May 2025, review 14 months); early site permit held since 2019",
      "key_milestone_date": "2026-09-29",
      "target_operation_year": null,
      "fuel": "LEU",
      "fuel_enrichment_pct": null,
      "customer_or_offtaker": "Tennessee Valley Authority",
      "is_floating": false,
      "use_case": "grid",
      "source_url": "https://www.gevernova.com/news/press-releases/nrc-issues-first-us-construction-permit-bwrx-300-small-modular-reactor-tva-clinch-river",
      "source_name": "GE Vernova press release 2026-09-29",
      "as_of_date": "2026-10-09",
      "confidence": "high",
      "notes": "TVA has announced no construction start date or cost and is negotiating cost-sharing with industry partners (WNN 2026-09-30). Coordinates: approximate (Clinch River site)."
    },
    {
      "project_id": "bwrx300-osge-wloclawek",
      "design": "GE Vernova Hitachi BWRX-300",
      "design_family": "BWR-SMR",
      "developer": "GE Vernova Hitachi Nuclear Energy / OSGE",
      "developer_country_iso3": "USA",
      "site_name": "Włocławek (Anwil site), Kuyavian-Pomeranian",
      "site_country_iso3": "POL",
      "lat": 52.648,
      "lon": 19.068,
      "capacity_mwe_per_module": 300,
      "modules_planned": null,
      "capacity_mwe_total": null,
      "status": "pre_licensing",
      "regulator": "PAA",
      "regulator_stage": "Decisions-in-principle for six sites (2023); pre-licensing regulatory opinion requests filed 2026-06-22 (fuel, software); CfD/state-aid application for 14 units filed 2026-07; no construction licence application yet",
      "key_milestone_date": "2026-07-01",
      "target_operation_year": 2032,
      "fuel": "LEU",
      "fuel_enrichment_pct": null,
      "customer_or_offtaker": "Orlen Synthos Green Energy (Orlen + Synthos Green Energy JV)",
      "is_floating": false,
      "use_case": "grid",
      "source_url": "https://www.nucnet.org/news/poland-s-osge-begins-state-support-bid-for-construction-of-small-modular-reactor-fleet-7-3-2026",
      "source_name": "NucNet 2026-07-01",
      "as_of_date": "2026-10-09",
      "confidence": "medium",
      "notes": "Włocławek named first site (first unit 2032); other named sites Stawy Monowskie and Stalowa Wola. Unit count per site not published; 14 units in CfD application, 26 in full programme. Coordinates: city-level."
    },
    {
      "project_id": "bwrx300-fermi-energia-estonia",
      "design": "GE Vernova Hitachi BWRX-300",
      "design_family": "BWR-SMR",
      "developer": "GE Vernova Hitachi Nuclear Energy / Fermi Energia",
      "developer_country_iso3": "USA",
      "site_name": "Candidate sites: Kunda (Viru-Nigula) and Aa (Lüganuse); Madala property near Kunda port under conditional agreement",
      "site_country_iso3": "EST",
      "lat": 59.5,
      "lon": 26.53,
      "capacity_mwe_per_module": 300,
      "modules_planned": 2,
      "capacity_mwe_total": 600,
      "status": "pre_licensing",
      "regulator": "TTJA (new regulator under TEOS act)",
      "regulator_stage": "Nuclear Energy and Safety Act (TEOS) passed by Riigikogu 2026-06, in force 2027-01; national spatial plan/SEA started 2025-05; construction permit application planned 2029",
      "key_milestone_date": "2026-06-30",
      "target_operation_year": 2035,
      "fuel": "LEU",
      "fuel_enrichment_pct": null,
      "customer_or_offtaker": "Fermi Energia",
      "is_floating": false,
      "use_case": "grid",
      "source_url": "https://world-nuclear.org/information-library/country-profiles/countries-a-f/estonia",
      "source_name": "WNA Estonia profile (updated 2026-08-04)",
      "as_of_date": "2026-10-09",
      "confidence": "medium",
      "notes": "Coordinates are Kunda town-level; final site not selected (pre-selection 2025-2027). Parliament must approve any build decision (TEOS amendment). Exact TEOS adoption day not captured (June 2026)."
    },
    {
      "project_id": "bwrx300-saskpower-rafferty",
      "design": "GE Vernova Hitachi BWRX-300",
      "design_family": "BWR-SMR",
      "developer": "GE Vernova Hitachi Nuclear Energy",
      "developer_country_iso3": "USA",
      "site_name": "Rafferty Reservoir site near Estevan, Saskatchewan",
      "site_country_iso3": "CAN",
      "lat": 49.14,
      "lon": -103.08,
      "capacity_mwe_per_module": 300,
      "modules_planned": 2,
      "capacity_mwe_total": 600,
      "status": "pre_licensing",
      "regulator": "CNSC",
      "regulator_stage": "Site selected for further study 2026-09-29; no licence application filed",
      "key_milestone_date": "2026-09-29",
      "target_operation_year": null,
      "fuel": "LEU",
      "fuel_enrichment_pct": null,
      "customer_or_offtaker": "SaskPower",
      "is_floating": false,
      "use_case": "grid",
      "source_url": "https://www.saskatchewan.ca/government/news-and-media/2026/september/29/saskatchewan-advances-nuclear-power-to-support-long-term-energy-security",
      "source_name": "Government of Saskatchewan release 2026-09-29",
      "as_of_date": "2026-10-09",
      "confidence": "medium",
      "notes": "Province goal of at least 600 MW in the Estevan area (hence 2 units assumed from the Oct 2025 strategy 'two SMR units near Estevan', WNN 2025-10-21); mid-2030s deployment previously indicated. Province also plans two large reactors (>2,000 MW, first by 2042) and 2,600 MW nuclear by 2050. Coordinates: approximate reservoir location."
    },
    {
      "project_id": "bwrx300-blue-energy-port-victoria",
      "design": "GE Vernova Hitachi BWRX-300",
      "design_family": "BWR-SMR",
      "developer": "GE Vernova Hitachi Nuclear Energy / Blue Energy",
      "developer_country_iso3": "USA",
      "site_name": "Blue Energy Center, Port of Victoria, Texas",
      "site_country_iso3": "USA",
      "lat": 28.63,
      "lon": -96.98,
      "capacity_mwe_per_module": 300,
      "modules_planned": 1,
      "capacity_mwe_total": 300,
      "status": "licence_application",
      "regulator": "NRC",
      "regulator_stage": "Part 1 of phased construction permit application (with limited work authorization request) submitted 2026-09-16; part 2 expected 2027 after one year of site data collection",
      "key_milestone_date": "2026-09-16",
      "target_operation_year": null,
      "fuel": "LEU",
      "fuel_enrichment_pct": null,
      "customer_or_offtaker": "Blue Energy Global (gas-plus-nuclear campus; data-centre offtake reported in press)",
      "is_floating": false,
      "use_case": "data_centre",
      "source_url": "https://www.gevernova.com/news/press-releases/blue-energy-texas-gas-plus-nuclear-project-nrc-review",
      "source_name": "GE Vernova press release 2026-09-16",
      "as_of_date": "2026-10-09",
      "confidence": "medium",
      "notes": "Federal Register notice 2026-10-08 titled 'Blue Energy Center-Port of Victoria Nuclear Unit 1; Phased Construction Permit Application-Limited Work Authorization'. NRC acceptance/docketing date not confirmed. Coordinates: approximate (Port of Victoria)."
    },
    {
      "project_id": "rr-smr-wylfa-gben",
      "design": "Rolls-Royce SMR (470 MWe PWR)",
      "design_family": "iPWR",
      "developer": "Rolls-Royce SMR Ltd",
      "developer_country_iso3": "GBR",
      "site_name": "Wylfa / Gwyndod, Ynys Môn (Anglesey), Wales",
      "site_country_iso3": "GBR",
      "lat": 53.416,
      "lon": -4.483,
      "capacity_mwe_per_module": 470,
      "modules_planned": 3,
      "capacity_mwe_total": 1410,
      "status": "pre_licensing",
      "regulator": "ONR",
      "regulator_stage": "GDA Step 3 (final step) since 2024-07-30, originally due to complete Aug 2026 (completion not confirmed as of 2026-10-09); Wylfa selected as first site 2025-11-13; nuclear site licence application not yet reported",
      "key_milestone_date": "2025-11-13",
      "target_operation_year": null,
      "fuel": "LEU",
      "fuel_enrichment_pct": null,
      "customer_or_offtaker": "Great British Energy - Nuclear (preferred bidder selection 2025-06-10; >GBP 2.5bn programme funding)",
      "is_floating": false,
      "use_case": "grid",
      "source_url": "https://www.onr.org.uk/news/all-news/2025/11/onr-comment-on-smr-siting-announcement",
      "source_name": "ONR 2025-11-13",
      "as_of_date": "2026-10-09",
      "confidence": "medium",
      "notes": "Government target: grid connection mid-2030s (GOV.UK 2025-06-10). Rolls-Royce SMR 'Our Progress' page names the site Gwyndod, Ynys Môn and notes a site-specific development contract signed with GBE-N in 2026 (no day given). Coordinates: Wylfa site."
    },
    {
      "project_id": "rr-smr-temelin-cez",
      "design": "Rolls-Royce SMR (470 MWe PWR)",
      "design_family": "iPWR",
      "developer": "Rolls-Royce SMR Ltd",
      "developer_country_iso3": "GBR",
      "site_name": "Temelín nuclear site, South Bohemia",
      "site_country_iso3": "CZE",
      "lat": 49.18,
      "lon": 14.376,
      "capacity_mwe_per_module": 470,
      "modules_planned": null,
      "capacity_mwe_total": null,
      "status": "pre_licensing",
      "regulator": "SÚJB",
      "regulator_stage": "Early Works Contract (design, permitting preparation, site application development) signed 2026-04 and Temelín EWC reported Sept 2026; no siting permit application confirmed",
      "key_milestone_date": "2026-04-27",
      "target_operation_year": null,
      "fuel": "LEU",
      "fuel_enrichment_pct": null,
      "customer_or_offtaker": "ČEZ Group (shareholder in Rolls-Royce SMR)",
      "is_floating": false,
      "use_case": "grid",
      "source_url": "https://www.ans.org/news/2026-04-27/article-7984/rollsroyceez-smr-project-at-temeln-moves-forward/",
      "source_name": "ANS Nuclear Newswire 2026-04-27",
      "as_of_date": "2026-10-09",
      "confidence": "medium",
      "notes": "Programme ambition up to 3 GW in Czechia; MoUs for Tušimice and Dětmarovice sites. Unit count at Temelín not published. Rolls-Royce SMR progress page dates the Temelín EWC to September 2026 while ANS reported an early works contract in April 2026 — treat date as 2026 (Apr-Sep). Coordinates: Temelín NPP."
    },
    {
      "project_id": "rr-smr-varo-videberg",
      "design": "Rolls-Royce SMR (470 MWe PWR)",
      "design_family": "iPWR",
      "developer": "Rolls-Royce SMR Ltd",
      "developer_country_iso3": "GBR",
      "site_name": "Värö peninsula near Ringhals, Halland",
      "site_country_iso3": "SWE",
      "lat": 57.26,
      "lon": 12.111,
      "capacity_mwe_per_module": 470,
      "modules_planned": 3,
      "capacity_mwe_total": 1410,
      "status": "pre_licensing",
      "regulator": "SSM",
      "regulator_stage": "Technology selected 2026-06-15 over BWRX-300; state-aid application lodged with Swedish government Dec 2025 (act in force 2025-08-01); no SSM licence application yet",
      "key_milestone_date": "2026-06-15",
      "target_operation_year": null,
      "fuel": "LEU",
      "fuel_enrichment_pct": null,
      "customer_or_offtaker": "Videberg Kraft (Vattenfall + Industrikraft; Swedish state to become majority owner)",
      "is_floating": false,
      "use_case": "grid",
      "source_url": "https://www.world-nuclear-news.org/articles/swedish-new-nuclear-project-selects-rolls-royce-smrs",
      "source_name": "WNN 2026-06-15",
      "as_of_date": "2026-10-09",
      "confidence": "medium",
      "notes": "First unit targeted mid-2030s; ~1.5 GW total. Coordinates: Ringhals site."
    },
    {
      "project_id": "linglong-one-changjiang",
      "design": "ACP100 (Linglong One)",
      "design_family": "iPWR",
      "developer": "CNNC",
      "developer_country_iso3": "CHN",
      "site_name": "Changjiang NPP, Hainan",
      "site_country_iso3": "CHN",
      "lat": 19.459,
      "lon": 108.895,
      "capacity_mwe_per_module": 125,
      "modules_planned": 1,
      "capacity_mwe_total": 125,
      "status": "under_construction",
      "regulator": "NNSA",
      "regulator_stage": "Construction since 2021-07; cold tests completed 2025-10; hot functional testing reported underway Oct 2026; fuel loading and grid connection targeted before end-2026",
      "key_milestone_date": "2026-10-07",
      "target_operation_year": 2026,
      "fuel": "LEU",
      "fuel_enrichment_pct": null,
      "customer_or_offtaker": "Hainan Nuclear Power Co (CNNC)",
      "is_floating": false,
      "use_case": "grid",
      "source_url": "https://www.nucnet.org/news/hot-testing-begins-at-china-s-linglong-1-small-modular-reactor-10-3-2026",
      "source_name": "NucNet 2026-10-07",
      "as_of_date": "2026-10-09",
      "confidence": "medium",
      "notes": "World's first commercial land-based SMR to reach hot testing; a Dec 2025 CNNC statement had targeted commercial operation in H1 2026, now slipped to end-2026 fuel load/grid connection. Hot-test start date not given (local media). Coordinates: approximate."
    },
    {
      "project_id": "htr-pm-shidaowan",
      "design": "HTR-PM (2x250 MWt pebble-bed HTGR)",
      "design_family": "HTGR",
      "developer": "China Huaneng / CNEC / Tsinghua INET",
      "developer_country_iso3": "CHN",
      "site_name": "Shidao Bay (Shidaowan), Rongcheng, Shandong",
      "site_country_iso3": "CHN",
      "lat": 36.957,
      "lon": 122.52,
      "capacity_mwe_per_module": 210,
      "modules_planned": 1,
      "capacity_mwe_total": 210,
      "status": "operating",
      "regulator": "NNSA",
      "regulator_stage": "Operating permit 2021-08; grid connection 2021-12; commercial operation declared 2023-12-06",
      "key_milestone_date": "2023-12-06",
      "target_operation_year": 2023,
      "fuel": "LEU+",
      "fuel_enrichment_pct": 8.5,
      "customer_or_offtaker": "China Huaneng Group",
      "is_floating": false,
      "use_case": "grid",
      "source_url": "https://www.world-nuclear-news.org/Articles/Chinese-HTR-PM-Demo-begins-commercial-operation",
      "source_name": "WNN 2023-12-06",
      "as_of_date": "2026-10-09",
      "confidence": "high",
      "notes": "Two 250 MWt reactor modules feed one 210 MWe turbine; TRISO pebbles enriched 8.5% (fuel class LEU+ / TRISO). Coordinates: approximate."
    },
    {
      "project_id": "akademik-lomonosov-pevek",
      "design": "KLT-40S floating NPP (Akademik Lomonosov)",
      "design_family": "floating",
      "developer": "Rosatom / OKBM Afrikantov",
      "developer_country_iso3": "RUS",
      "site_name": "Pevek, Chukotka",
      "site_country_iso3": "RUS",
      "lat": 69.7,
      "lon": 170.283,
      "capacity_mwe_per_module": 35,
      "modules_planned": 2,
      "capacity_mwe_total": 70,
      "status": "operating",
      "regulator": "Rostekhnadzor",
      "regulator_stage": "Grid connection 2019-12-19; commercial operation May 2020",
      "key_milestone_date": "2020-05-22",
      "target_operation_year": 2020,
      "fuel": "HALEU",
      "fuel_enrichment_pct": null,
      "customer_or_offtaker": "Rosenergoatom (Chukotka grid and Pevek heat)",
      "is_floating": true,
      "use_case": "remote",
      "source_url": "https://world-nuclear.org/information-library/country-profiles/countries-o-s/russia-nuclear-power",
      "source_name": "WNA Russia profile (updated 2026-07-22)",
      "as_of_date": "2026-10-09",
      "confidence": "high",
      "notes": "WNA lists 2x35 MWe gross / 32 MWe net per unit; fuel 'LEU below 20% U-235' (classified here as HALEU because >5%); exact enrichment not verified. Commercial-operation day (22 May 2020) from prior knowledge; WNA gives 'May 2020'. Coordinates: Pevek."
    },
    {
      "project_id": "ritm-200n-yakutia-ust-kuyga",
      "design": "RITM-200N land-based SMR",
      "design_family": "iPWR",
      "developer": "Rosatom",
      "developer_country_iso3": "RUS",
      "site_name": "Ust-Kuyga, Ust-Yansky District, Yakutia",
      "site_country_iso3": "RUS",
      "lat": 70.017,
      "lon": 135.6,
      "capacity_mwe_per_module": 55,
      "modules_planned": 2,
      "capacity_mwe_total": 110,
      "status": "licensed",
      "regulator": "Rostekhnadzor",
      "regulator_stage": "Construction licence granted 2023-04; site preparation (camps, access road) 2025; first concrete not confirmed in sources reviewed",
      "key_milestone_date": "2023-04-01",
      "target_operation_year": 2030,
      "fuel": "HALEU",
      "fuel_enrichment_pct": null,
      "customer_or_offtaker": "Rosatom (power for Kyuchus gold project and Yakutia settlements)",
      "is_floating": false,
      "use_case": "remote",
      "source_url": "https://world-nuclear.org/information-library/country-profiles/countries-o-s/russia-nuclear-power",
      "source_name": "WNA Russia profile (updated 2026-07-22)",
      "as_of_date": "2026-10-09",
      "confidence": "low",
      "notes": "WNA planned-reactor table lists 2x55 MWe with 2030 operation; NEI (2025-03-28) described a single 55 MWe unit with commissioning in 2028 — module count and date conflict between sources. Fuel class 'HALEU' reflects RITM-200 <20% enrichment (not verified for 200N). Coordinates: settlement-level."
    },
    {
      "project_id": "baimsky-floating-units-cape-nagloynyn",
      "design": "RITM-200S floating power units (PEB-106)",
      "design_family": "floating",
      "developer": "Rosatom (Atomenergomash / Baltic Shipyard; hulls Wison Nantong)",
      "developer_country_iso3": "RUS",
      "site_name": "Cape Nagloynyn, Chaun Bay, Chukotka",
      "site_country_iso3": "RUS",
      "lat": null,
      "lon": null,
      "capacity_mwe_per_module": 106,
      "modules_planned": 4,
      "capacity_mwe_total": 424,
      "status": "under_construction",
      "regulator": "Rostekhnadzor",
      "regulator_stage": "Units 1-2 under construction since 2022-08-31 (WNA); first RITM-200S reactor shipped from ZiO-Podolsk May 2026",
      "key_milestone_date": "2026-05-27",
      "target_operation_year": null,
      "fuel": "HALEU",
      "fuel_enrichment_pct": null,
      "customer_or_offtaker": "Baimskaya GOK copper mine (KAZ Minerals)",
      "is_floating": true,
      "use_case": "remote",
      "source_url": "https://www.nucnet.org/news/russia-ships-first-reactor-unit-for-far-east-floating-nuclear-plant-5-3-2026",
      "source_name": "NucNet 2026-05-27",
      "as_of_date": "2026-10-09",
      "confidence": "low",
      "notes": "Capacity conflict: WNA text says 4 units/8 reactors = 440 MWe while its table lists 4x106 MWe; 106 MWe per unit used here. Delivery years not confirmed in sources reviewed (earlier plans: 2027-2031). Site coordinates not verified -> null. Fuel class per RITM-200 <20% enrichment, not verified."
    },
    {
      "project_id": "xe-100-long-mott-seadrift",
      "design": "X-energy Xe-100 (HTGR)",
      "design_family": "HTGR",
      "developer": "X-energy",
      "developer_country_iso3": "USA",
      "site_name": "Long Mott Generating Station, Dow Seadrift Operations, Calhoun County, Texas",
      "site_country_iso3": "USA",
      "lat": 28.459,
      "lon": -96.763,
      "capacity_mwe_per_module": 80,
      "modules_planned": 4,
      "capacity_mwe_total": 320,
      "status": "licence_application",
      "regulator": "NRC",
      "regulator_stage": "CPA docketed May 2025; environmental assessment with FONSI issued 2026-05 (Federal Register 2026-05-20); mandatory hearing held 2026-09-22; CP decision pending (safety review due later 2026)",
      "key_milestone_date": "2026-09-22",
      "target_operation_year": null,
      "fuel": "TRISO-HALEU",
      "fuel_enrichment_pct": 15.5,
      "customer_or_offtaker": "Dow (Long Mott Energy LLC) — process heat and power for Seadrift chemicals site; DOE ARDP cost share",
      "is_floating": false,
      "use_case": "industrial_heat",
      "source_url": "https://www.nrc.gov/public-involve/public-meetings/pmns/20260726",
      "source_name": "NRC mandatory hearing notice (2026-09-22 hearing)",
      "as_of_date": "2026-10-09",
      "confidence": "high",
      "notes": "Four Xe-100 at 80 MWe each (WNN 2026-05-19). TRISO enrichment 15.5% is X-energy design data (not re-verified today). Hearing record closed 2026-10-06; permit not issued as of 2026-10-09 per sources reviewed. Coordinates: approximate (Seadrift plant)."
    },
    {
      "project_id": "xe-100-cascade-energy-northwest",
      "design": "X-energy Xe-100 (HTGR)",
      "design_family": "HTGR",
      "developer": "X-energy",
      "developer_country_iso3": "USA",
      "site_name": "Cascade Advanced Energy Facility, DOE Hanford Reservation adjacent to Columbia Generating Station, Benton County, Washington",
      "site_country_iso3": "USA",
      "lat": 46.471,
      "lon": -119.333,
      "capacity_mwe_per_module": 80,
      "modules_planned": 12,
      "capacity_mwe_total": 960,
      "status": "pre_licensing",
      "regulator": "NRC",
      "regulator_stage": "NRC pre-application activities since 2024-08 (docket 99902130) for a future Part 50 construction permit application; no CPA submitted as of 2026-09-08 page update",
      "key_milestone_date": "2024-08-01",
      "target_operation_year": null,
      "fuel": "TRISO-HALEU",
      "fuel_enrichment_pct": 15.5,
      "customer_or_offtaker": "Energy Northwest New Nuclear LLC; Amazon (funding / offtake)",
      "is_floating": false,
      "use_case": "data_centre",
      "source_url": "https://www.nrc.gov/reactors/new-reactors/advanced/who-were-working-with/pre-application-activities/energy-northwest",
      "source_name": "NRC pre-application page (updated 2026-09-08)",
      "as_of_date": "2026-10-09",
      "confidence": "medium",
      "notes": "Up to 12 units (960 MWe) per NRC page; initial phase of 4 units (320 MWe) reported in press. Coordinates: Columbia Generating Station."
    },
    {
      "project_id": "natrium-kemmerer-unit1",
      "design": "TerraPower Natrium (SFR + molten-salt storage)",
      "design_family": "SFR",
      "developer": "TerraPower",
      "developer_country_iso3": "USA",
      "site_name": "Kemmerer Power Station Unit 1, near Naughton plant, Kemmerer, Wyoming",
      "site_country_iso3": "USA",
      "lat": 41.751,
      "lon": -110.6,
      "capacity_mwe_per_module": 345,
      "modules_planned": 1,
      "capacity_mwe_total": 345,
      "status": "under_construction",
      "regulator": "NRC",
      "regulator_stage": "NRC Commission approved construction permit 2026-03-04 (first US commercial advanced-reactor CP); ground broken on nuclear plant spring 2026",
      "key_milestone_date": "2026-03-04",
      "target_operation_year": 2031,
      "fuel": "HALEU",
      "fuel_enrichment_pct": null,
      "customer_or_offtaker": "PacifiCorp (partner); DOE ARDP cost share",
      "is_floating": false,
      "use_case": "grid",
      "source_url": "https://www.terrapower.com/NRC-Approves-Natrium-Reactor-Construction-Permit",
      "source_name": "TerraPower press release 2026-03-04",
      "as_of_date": "2026-10-09",
      "confidence": "high",
      "notes": "345 MWe base, 500 MWe peak via storage. Construction completion targeted 2030, commercial operation 2031 (ANS 2026-09-21). Bechtel exited as EPC Sept 2026 (WARN notice 2026-09-15); EPC to be rebid; TerraPower says no schedule impact. HALEU metallic fuel per design (enrichment not stated in sources). Coordinates: approximate."
    },
    {
      "project_id": "kairos-hermes-1-oak-ridge",
      "design": "Kairos Hermes (35 MWt FHR test reactor)",
      "design_family": "MSR",
      "developer": "Kairos Power",
      "developer_country_iso3": "USA",
      "site_name": "Heritage Center (ETTP), Oak Ridge, Tennessee",
      "site_country_iso3": "USA",
      "lat": 35.962,
      "lon": -84.39,
      "capacity_mwe_per_module": 0,
      "modules_planned": 1,
      "capacity_mwe_total": 0,
      "status": "under_construction",
      "regulator": "NRC",
      "regulator_stage": "Construction permit 2023-12; safety-related construction began 2025-05-01; NRC extended latest construction completion date from 2026-12-31 to 2029-04-30 (2026-04)",
      "key_milestone_date": "2026-04-22",
      "target_operation_year": 2028,
      "fuel": "TRISO-HALEU",
      "fuel_enrichment_pct": null,
      "customer_or_offtaker": "Kairos Power (DOE ARDP risk-reduction award)",
      "is_floating": false,
      "use_case": "research",
      "source_url": "https://world-nuclear-news.org/articles/regulator-extends-hermes-1-reactor-construction-deadline",
      "source_name": "WNN 2026-04-22",
      "as_of_date": "2026-10-09",
      "confidence": "high",
      "notes": "Non-power test reactor (35 MWt, 0 MWe). Kairos now expects construction complete in 2028 (slip from 2027). Federal Register 2026-05-18 records the extension order. Coordinates: approximate (ETTP)."
    },
    {
      "project_id": "kairos-hermes-2-oak-ridge",
      "design": "Kairos Hermes 2 (KP-FHR demonstration, ~50 MWe)",
      "design_family": "MSR",
      "developer": "Kairos Power",
      "developer_country_iso3": "USA",
      "site_name": "Heritage Center (ETTP), Oak Ridge, Tennessee",
      "site_country_iso3": "USA",
      "lat": 35.962,
      "lon": -84.39,
      "capacity_mwe_per_module": 50,
      "modules_planned": 1,
      "capacity_mwe_total": 50,
      "status": "under_construction",
      "regulator": "NRC",
      "regulator_stage": "Construction permit 2024-11; groundbreaking 2026-04-17",
      "key_milestone_date": "2026-04-17",
      "target_operation_year": 2030,
      "fuel": "TRISO-HALEU",
      "fuel_enrichment_pct": null,
      "customer_or_offtaker": "TVA grid delivery under PPA; Google (2024 master agreement, first deployment)",
      "is_floating": false,
      "use_case": "data_centre",
      "source_url": "https://www.kairospower.com/updates/kairos-power-breaks-ground-on-hermes-2-demonstration-plant",
      "source_name": "Kairos Power 2026-04-17",
      "as_of_date": "2026-10-09",
      "confidence": "high",
      "notes": "Up to 50 MWe to TVA grid supporting Google data centres in TN/AL. Target 2030 is from press coverage of the Google agreement (not stated in the Kairos release) — medium confidence on the year. Coordinates: approximate (ETTP)."
    },
    {
      "project_id": "oklo-aurora-inl",
      "design": "Oklo Aurora Powerhouse (liquid-metal fast reactor, 75 MWe)",
      "design_family": "SFR",
      "developer": "Oklo Inc.",
      "developer_country_iso3": "USA",
      "site_name": "Idaho National Laboratory (DOE site-use permit area), Idaho",
      "site_country_iso3": "USA",
      "lat": 43.593,
      "lon": -112.655,
      "capacity_mwe_per_module": 75,
      "modules_planned": 1,
      "capacity_mwe_total": 75,
      "status": "under_construction",
      "regulator": "DOE (Reactor Pilot Program) / NRC pre-application",
      "regulator_stage": "Groundbreaking 2025-09; DOE PDSA approved 2026-06-11 under Reactor Pilot Program; NRC pre-application docket 99902095 (COLA phase-1 readiness assessment 2025; pre-phase-2 audit under review) — no COLA docketed",
      "key_milestone_date": "2026-06-11",
      "target_operation_year": null,
      "fuel": "HALEU",
      "fuel_enrichment_pct": null,
      "customer_or_offtaker": "Oklo (merchant; data-centre LOIs reported)",
      "is_floating": false,
      "use_case": "grid",
      "source_url": "https://www.ans.org/news/article-8178/the-deadline-arrives-checking-in-on-the-reactor-pilot-program/",
      "source_name": "ANS Nuclear News 2026-07-02 (RPP status)",
      "as_of_date": "2026-10-09",
      "confidence": "medium",
      "notes": "Metal HALEU fuel incl. ~5 t recovered from EBR-II (NEI 2025-03-26). Oklo gave no criticality date in RPP coverage. NRC page updated 2026-09-15 (https://www.nrc.gov/reactors/new-reactors/advanced/who-were-working-with/pre-application-activities/okla-aurora-powerhouse). Coordinates: INL MFC area, approximate."
    },
    {
      "project_id": "holtec-smr300-palisades-pioneer",
      "design": "Holtec SMR-300 (Pioneer Units 1 and 2)",
      "design_family": "iPWR",
      "developer": "Holtec International (Hyundai E&C EPC partner)",
      "developer_country_iso3": "USA",
      "site_name": "Palisades site, Covert Township, Michigan",
      "site_country_iso3": "USA",
      "lat": 42.323,
      "lon": -86.315,
      "capacity_mwe_per_module": 300,
      "modules_planned": 2,
      "capacity_mwe_total": 600,
      "status": "licence_application",
      "regulator": "NRC",
      "regulator_stage": "Phase-1 construction permit application with limited work authorization submitted 2026-01 (Federal Register 2026-01-22); NRC accepted part 1 for review 2026-02; final SER/EIS expected 2027-03",
      "key_milestone_date": "2026-02-25",
      "target_operation_year": null,
      "fuel": "LEU",
      "fuel_enrichment_pct": null,
      "customer_or_offtaker": "Holtec Palisades LLC",
      "is_floating": false,
      "use_case": "grid",
      "source_url": "https://www.nucnet.org/news/us-nuclear-regulator-accepts-partial-construction-permit-application-for-palisades-smrs-2-3-2026",
      "source_name": "NucNet 2026-02-25",
      "as_of_date": "2026-10-09",
      "confidence": "medium",
      "notes": "Holtec has publicly targeted operation around 2030 (not confirmed in sources reviewed today -> target null). Hyundai E&C is Holtec's EPC/strategic partner for SMR-300 (not separately recorded). Coordinates: Palisades plant."
    },
    {
      "project_id": "westinghouse-ap300",
      "design": "Westinghouse AP300",
      "design_family": "iPWR",
      "developer": "Westinghouse Electric Company",
      "developer_country_iso3": "USA",
      "site_name": null,
      "site_country_iso3": "USA",
      "lat": null,
      "lon": null,
      "capacity_mwe_per_module": 300,
      "modules_planned": null,
      "capacity_mwe_total": null,
      "status": "concept",
      "regulator": "NRC",
      "regulator_stage": "NRC pre-application (docket 99902111); regulatory engagement plan updated 2026-06-11; 11 white papers with NRC feedback; no DC/SDA application date published",
      "key_milestone_date": "2026-06-11",
      "target_operation_year": null,
      "fuel": "LEU",
      "fuel_enrichment_pct": null,
      "customer_or_offtaker": "None firm; SaskPower-Cameco-Westinghouse MoU (Oct 2025) covers AP1000/AP300 pathways; Community Nuclear Power (UK Teesside, 4 units) agreement 2024",
      "is_floating": false,
      "use_case": "grid",
      "source_url": "https://www.nrc.gov/reactors/new-reactors/advanced/who-were-working-with/pre-application-activities/westinghouse",
      "source_name": "NRC AP300 pre-application page (updated 2026-09-08)",
      "as_of_date": "2026-10-09",
      "confidence": "medium",
      "notes": "No named site with a regulatory filing; the 2024 UK Teesside (Community Nuclear Power) plan has no verified 2026 progress. Twelfth white paper (licensing application approach) marked 'no longer planned'."
    },
    {
      "project_id": "newcleo-lfr-france",
      "design": "newcleo LFR-AS-30 demonstrator / LFR-AS-200",
      "design_family": "LFR",
      "developer": "newcleo",
      "developer_country_iso3": "GBR",
      "site_name": null,
      "site_country_iso3": "FRA",
      "lat": null,
      "lon": null,
      "capacity_mwe_per_module": 30,
      "modules_planned": 1,
      "capacity_mwe_total": 30,
      "status": "pre_licensing",
      "regulator": "ASNR",
      "regulator_stage": "Safety options dossier submitted to ASNR (reported 2026-01-15); construction authorisation applications for reactor and MOX fuel line planned before end-2027; public debate 2026",
      "key_milestone_date": "2026-01-15",
      "target_operation_year": 2032,
      "fuel": "other",
      "fuel_enrichment_pct": null,
      "customer_or_offtaker": "newcleo (merchant); MOX pilot line at Nogent-sur-Seine",
      "is_floating": false,
      "use_case": "grid",
      "source_url": "https://www.world-nuclear-news.org/articles/licensing-of-newcleos-smr-progresses-in-France",
      "source_name": "WNN 2026-01-15",
      "as_of_date": "2026-10-09",
      "confidence": "medium",
      "notes": "Fuel: MOX (uranium-plutonium oxide). Reactor site in France not named in the source (null coordinates). Module rating 30 MWe is the demonstrator (LFR-AS-30) per developer; not stated in source. WNN flags a related story on newcleo scaling back UK operations (not reviewed). FID for first commercial plant ~2029."
    },
    {
      "project_id": "last-energy-pwr5-texas-am-rellis",
      "design": "Last Energy PWR-5 pilot (scaled PWR-20)",
      "design_family": "microreactor",
      "developer": "Last Energy",
      "developer_country_iso3": "USA",
      "site_name": "Texas A&M-RELLIS campus, Bryan, Texas",
      "site_country_iso3": "USA",
      "lat": 30.645,
      "lon": -96.473,
      "capacity_mwe_per_module": 5,
      "modules_planned": 1,
      "capacity_mwe_total": 5,
      "status": "under_construction",
      "regulator": "DOE (Reactor Pilot Program)",
      "regulator_stage": "PDSA approved by DOE late May 2026; final DSA submitted; building complete, critical components installed; criticality targeted summer 2026 pending DOE authorisation (not confirmed achieved as of 2026-10-09)",
      "key_milestone_date": "2026-05-29",
      "target_operation_year": 2026,
      "fuel": "LEU",
      "fuel_enrichment_pct": null,
      "customer_or_offtaker": "Last Energy / Texas A&M (pilot)",
      "is_floating": false,
      "use_case": "research",
      "source_url": "https://www.nucnet.org/news/us-doe-approves-pdsa-for-last-energy-pilot-nuclear-reactor-at-texas-university-5-5-2026",
      "source_name": "NucNet 2026-05-29",
      "as_of_date": "2026-10-09",
      "confidence": "medium",
      "notes": "Status per ANS 2026-07-02 RPP review. 5 MWe rating inferred from design name (PWR-5); not stated in sources. Coordinates: RELLIS campus, approximate."
    },
    {
      "project_id": "last-energy-llynfi-wales",
      "design": "Last Energy PWR-20 (4 units)",
      "design_family": "microreactor",
      "developer": "Last Energy",
      "developer_country_iso3": "USA",
      "site_name": "Former Llynfi power station, Maesteg, Bridgend, Wales",
      "site_country_iso3": "GBR",
      "lat": 51.63,
      "lon": -3.66,
      "capacity_mwe_per_module": 20,
      "modules_planned": 4,
      "capacity_mwe_total": 80,
      "status": "pre_licensing",
      "regulator": "ONR / Natural Resources Wales",
      "regulator_stage": "'Key regulatory review' completed July 2025 (NucNet headline); no nuclear site licence application confirmed",
      "key_milestone_date": "2025-07-01",
      "target_operation_year": null,
      "fuel": "LEU",
      "fuel_enrichment_pct": null,
      "customer_or_offtaker": "Last Energy (private offtake model)",
      "is_floating": false,
      "use_case": "industrial_heat",
      "source_url": "https://www.nucnet.org/news/us-doe-approves-pdsa-for-last-energy-pilot-nuclear-reactor-at-texas-university-5-5-2026",
      "source_name": "NucNet related-story index (July 2025 review)",
      "as_of_date": "2026-10-09",
      "confidence": "low",
      "notes": "Only a headline-level 2025 reference verified today; 2026 status unknown. Last Energy also announced 30 units in Haskell County, Texas (Feb 2025) — not recorded separately (no filing). Coordinates: Llynfi site, approximate."
    },
    {
      "project_id": "carem-25-lima",
      "design": "CAREM-25 prototype",
      "design_family": "iPWR",
      "developer": "CNEA",
      "developer_country_iso3": "ARG",
      "site_name": "Atucha site, Lima, Zárate Partido, Buenos Aires Province",
      "site_country_iso3": "ARG",
      "lat": -33.967,
      "lon": -59.205,
      "capacity_mwe_per_module": 25,
      "modules_planned": 1,
      "capacity_mwe_total": 25,
      "status": "on_hold",
      "regulator": "ARN",
      "regulator_stage": "Construction licence held since 2014 (first concrete 2014-02); construction halted 2024 amid layoffs; CNEA 'engineering revision stage'; no restart date",
      "key_milestone_date": "2024-09-17",
      "target_operation_year": null,
      "fuel": "LEU",
      "fuel_enrichment_pct": null,
      "customer_or_offtaker": "CNEA / Nucleoeléctrica Argentina",
      "is_floating": false,
      "use_case": "research",
      "source_url": "https://www.neimagazine.com/news/argentinas-carem-25-smr-faces-setbacks/",
      "source_name": "NEI 2024-09-17",
      "as_of_date": "2026-10-09",
      "confidence": "low",
      "notes": "Reported ~85% complete (union figure). 25 MWe net / ~32 MWe gross. No 2025-2026 status update found in sources reviewed today — status may have changed; flagged as gap. Coordinates: Atucha site."
    },
    {
      "project_id": "i-smr-korea",
      "design": "i-SMR (170 MWe x 4)",
      "design_family": "iPWR",
      "developer": "KHNP / KAERI (i-SMR Technology Development Project Group)",
      "developer_country_iso3": "KOR",
      "site_name": null,
      "site_country_iso3": "KOR",
      "lat": null,
      "lon": null,
      "capacity_mwe_per_module": 170,
      "modules_planned": 4,
      "capacity_mwe_total": 680,
      "status": "licence_application",
      "regulator": "NSSC",
      "regulator_stage": "Standard design approval application received by NSSC 2026-02-27; approval targeted 2028",
      "key_milestone_date": "2026-02-27",
      "target_operation_year": null,
      "fuel": "LEU",
      "fuel_enrichment_pct": null,
      "customer_or_offtaker": "Daegu Metropolitan City MoU (June 2024) for a 680 MWe plant near Daegu-Gyeongbuk New Airport; development from 2033",
      "is_floating": false,
      "use_case": "grid",
      "source_url": "https://www.world-nuclear-news.org/articles/standard-design-approval-sought-for-i-smr",
      "source_name": "WNN 2026-03-04",
      "as_of_date": "2026-10-09",
      "confidence": "medium",
      "notes": "Status refers to the design approval application (no site licence). No firm site -> null coordinates. NucNet reported two new large-reactor sites announced in Korea (June 2026) — not SMR-specific."
    },
    {
      "project_id": "arc-100-point-lepreau",
      "design": "ARC-100 (sodium fast reactor)",
      "design_family": "SFR",
      "developer": "ARC Clean Technology",
      "developer_country_iso3": "CAN",
      "site_name": "Point Lepreau, New Brunswick",
      "site_country_iso3": "CAN",
      "lat": 45.07,
      "lon": -66.455,
      "capacity_mwe_per_module": 100,
      "modules_planned": 1,
      "capacity_mwe_total": 100,
      "status": "licence_application",
      "regulator": "CNSC",
      "regulator_stage": "Licence to Prepare Site application submitted 2023-06-30 — CNSC 'awaiting additional submissions from NB Power' (page updated 2026-01-26); CNSC VDR Phase 2 completed July 2025 ('no fundamental barriers')",
      "key_milestone_date": "2025-07-11",
      "target_operation_year": null,
      "fuel": "HALEU",
      "fuel_enrichment_pct": null,
      "customer_or_offtaker": "NB Power",
      "is_floating": false,
      "use_case": "grid",
      "source_url": "https://www.cnsc-ccsn.gc.ca/eng/reactors/new-reactor-power-plant-projects/new-reactor-power-plant-facilities/nbpower/",
      "source_name": "CNSC NB Power ARC-100 page (updated 2026-01-26)",
      "as_of_date": "2026-10-09",
      "confidence": "medium",
      "notes": "Metallic uranium-alloy fuel (EBR-II lineage); HALEU classification per design, enrichment not stated. Provincial EIA ongoing. Coordinates: Point Lepreau NGS."
    },
    {
      "project_id": "moltex-ssr-w-point-lepreau",
      "design": "Moltex SSR-W (Stable Salt Reactor-Wasteburner) + WATSS",
      "design_family": "MSR",
      "developer": "Moltex Energy (in UK administration; assets being acquired by Nuclea Energy)",
      "developer_country_iso3": "GBR",
      "site_name": "Point Lepreau, New Brunswick (prospective)",
      "site_country_iso3": "CAN",
      "lat": 45.07,
      "lon": -66.455,
      "capacity_mwe_per_module": 300,
      "modules_planned": 1,
      "capacity_mwe_total": 300,
      "status": "on_hold",
      "regulator": "CNSC",
      "regulator_stage": "No licence application; vendor in UK administration — Nuclea Energy Canada signed definitive asset purchase agreement 2026-08-13 (closing subject to UK NSI review)",
      "key_milestone_date": "2026-08-13",
      "target_operation_year": null,
      "fuel": "other",
      "fuel_enrichment_pct": null,
      "customer_or_offtaker": "NB Power / Province of New Brunswick (prior arrangements)",
      "is_floating": false,
      "use_case": "grid",
      "source_url": "https://finance.yahoo.com/energy/articles/nuclea-energy-enters-definitive-agreement-200500136.html",
      "source_name": "Nuclea Energy press release via Yahoo Finance 2026-08-13",
      "as_of_date": "2026-10-09",
      "confidence": "medium",
      "notes": "SSR-W rated 300-500 MWe per release; 300 used as lower bound. Fuel: recycled used-fuel chloride salt (WATSS). Future of the Lepreau deployment not stated post-deal. Coordinates: Point Lepreau NGS."
    },
    {
      "project_id": "terrestrial-imsr-texas-am-rellis",
      "design": "Terrestrial Energy IMSR (Project TETRA)",
      "design_family": "MSR",
      "developer": "Terrestrial Energy",
      "developer_country_iso3": "CAN",
      "site_name": "Texas A&M-RELLIS Energy Proving Ground, Bryan, Texas (77-acre lease)",
      "site_country_iso3": "USA",
      "lat": 30.645,
      "lon": -96.473,
      "capacity_mwe_per_module": 392,
      "modules_planned": 1,
      "capacity_mwe_total": 392,
      "status": "pre_licensing",
      "regulator": "NRC / DOE (Reactor Pilot Program OTA)",
      "regulator_stage": "DOE RPP OTA signed 2026-01; ground lease and research agreements with TAMUS signed 2026-06; NRC safety evaluation approving IMSR principal design criteria (late 2025); CPA not yet filed",
      "key_milestone_date": "2026-06-17",
      "target_operation_year": null,
      "fuel": "LEU",
      "fuel_enrichment_pct": null,
      "customer_or_offtaker": "Terrestrial Energy (merchant); Zachry Group engineering services",
      "is_floating": false,
      "use_case": "grid",
      "source_url": "https://www.ans.org/news/2026-06-23/article-8139/terrestrial-energy-and-texas-am-reach-agreement-on-reactor-siting/",
      "source_name": "ANS 2026-06-23",
      "as_of_date": "2026-10-09",
      "confidence": "medium",
      "notes": "IMSR plant 392 MWe / 882 MWt per ANS; ANS RPP review lists 390 MWe. Pilot reactor demonstration under Project TETRA; commercial plant would need NRC CP. Coordinates: RELLIS, approximate."
    },
    {
      "project_id": "nano-kronos-mmr-uiuc",
      "design": "NANO Nuclear KRONOS MMR (ex-USNC MMR, HTGR)",
      "design_family": "microreactor",
      "developer": "NANO Nuclear Energy (acquired USNC MMR/Pylon assets in Jan 2025 bankruptcy sale)",
      "developer_country_iso3": "USA",
      "site_name": "University of Illinois Urbana-Champaign, Illinois",
      "site_country_iso3": "USA",
      "lat": 40.102,
      "lon": -88.227,
      "capacity_mwe_per_module": null,
      "modules_planned": 1,
      "capacity_mwe_total": null,
      "status": "licence_application",
      "regulator": "NRC",
      "regulator_stage": "Construction permit application submitted by UIUC 2026-03-31; NRC accepted for review (announced 2026-05-20); review expected complete 2027; construction planned H2 2027",
      "key_milestone_date": "2026-05-20",
      "target_operation_year": null,
      "fuel": "TRISO-HALEU",
      "fuel_enrichment_pct": null,
      "customer_or_offtaker": "University of Illinois (research/demonstration)",
      "is_floating": false,
      "use_case": "research",
      "source_url": "https://nanonuclearenergy.com/nano-nuclears-kronos-mmr-and-the-university-of-illinois-urbana-champaign-advance-to-next-regulatory-milestone-as-u-s-nrc-formally-accepts-construction-permit-application-for-review/",
      "source_name": "NANO Nuclear press release 2026-05-20",
      "as_of_date": "2026-10-09",
      "confidence": "medium",
      "notes": "Power rating not stated in source (USNC MMR was ~15 MWt / ~5 MWe). Fuel: TRISO per developer; HALEU classification not independently verified. USNC asset acquisition (Jan 2025) per NANO 10-K/press (not re-read today). Coordinates: UIUC campus."
    },
    {
      "project_id": "antares-mark0-inl",
      "design": "Antares Mark-0 (zero-power test reactor)",
      "design_family": "microreactor",
      "developer": "Antares Nuclear",
      "developer_country_iso3": "USA",
      "site_name": "Idaho National Laboratory, Idaho",
      "site_country_iso3": "USA",
      "lat": 43.52,
      "lon": -112.95,
      "capacity_mwe_per_module": 0,
      "modules_planned": 1,
      "capacity_mwe_total": 0,
      "status": "operating",
      "regulator": "DOE (Reactor Pilot Program authorisation)",
      "regulator_stage": "Zero-power fuelled criticality achieved 2026-06-04 — first DOE Reactor Pilot Program criticality",
      "key_milestone_date": "2026-06-04",
      "target_operation_year": 2026,
      "fuel": null,
      "fuel_enrichment_pct": null,
      "customer_or_offtaker": "Antares (demonstration; R1 successor is TRISO-fuelled)",
      "is_floating": false,
      "use_case": "research",
      "source_url": "https://www.ans.org/news/article-8178/the-deadline-arrives-checking-in-on-the-reactor-pilot-program/",
      "source_name": "ANS Nuclear News 2026-07-02 (RPP status) + DOE releases",
      "as_of_date": "2026-10-09",
      "confidence": "medium",
      "notes": "'Operating' here means a fuelled zero-power criticality demonstration, not power production. Fuel for Mark-0 not stated in sources (null). Coordinates: INL site centroid, approximate."
    },
    {
      "project_id": "valar-ward250-utah-srel",
      "design": "Valar Atomics Ward 250 (helium-cooled, graphite-moderated HTGR)",
      "design_family": "microreactor",
      "developer": "Valar Atomics",
      "developer_country_iso3": "USA",
      "site_name": "Utah San Rafael Energy Lab, Emery County, Utah",
      "site_country_iso3": "USA",
      "lat": null,
      "lon": null,
      "capacity_mwe_per_module": null,
      "modules_planned": 1,
      "capacity_mwe_total": null,
      "status": "operating",
      "regulator": "DOE (Reactor Pilot Program authorisation)",
      "regulator_stage": "Zero-power fuelled criticality 2026-06-18 (second RPP criticality); 10 kWt output converted to electricity 2026-06-22",
      "key_milestone_date": "2026-06-18",
      "target_operation_year": 2026,
      "fuel": "TRISO-HALEU",
      "fuel_enrichment_pct": null,
      "customer_or_offtaker": "Valar Atomics (demonstration; Project Beehive campus planned in Utah)",
      "is_floating": false,
      "use_case": "research",
      "source_url": "https://www.world-nuclear-news.org/articles/valar-atomics-achieves-criticality-in-doe-reactor-pilot-program",
      "source_name": "WNN 2026-06-22 + ANS 2026-07-02",
      "as_of_date": "2026-10-09",
      "confidence": "medium",
      "notes": "Thermal rating given as 100 kWt (ANS) vs '5 MW' (WNN) — design vs demonstration power; left null. Fuel TRISO per WNN; HALEU classification not independently verified. Site coordinates not verified -> null."
    },
    {
      "project_id": "deployable-energy-unity-inl",
      "design": "Deployable Energy Unity (water-moderated, gas-cooled microreactor, 1 MWe)",
      "design_family": "microreactor",
      "developer": "Deployable Energy",
      "developer_country_iso3": "USA",
      "site_name": "National Reactor Innovation Center, Idaho National Laboratory, Idaho",
      "site_country_iso3": "USA",
      "lat": 43.52,
      "lon": -112.95,
      "capacity_mwe_per_module": 1,
      "modules_planned": 1,
      "capacity_mwe_total": 1,
      "status": "operating",
      "regulator": "DOE (Reactor Pilot Program 'Launch Pad' authorisation)",
      "regulator_stage": "Zero-power fuelled criticality announced 2026-07-01 (third RPP criticality)",
      "key_milestone_date": "2026-07-01",
      "target_operation_year": 2026,
      "fuel": null,
      "fuel_enrichment_pct": null,
      "customer_or_offtaker": "Deployable Energy (demonstration); next in line for DOME testing (ANS 2026-10-02)",
      "is_floating": false,
      "use_case": "research",
      "source_url": "https://www.world-nuclear-news.org/articles/criticality-for-third-us-reactor-ahead-of-4-july-deadline",
      "source_name": "WNN 2026-07-02",
      "as_of_date": "2026-10-09",
      "confidence": "medium",
      "notes": "Added to the programme April 2026 via the Launch Pad track. Fuel not stated. Coordinates: INL centroid, approximate."
    },
    {
      "project_id": "aalo-x-inl",
      "design": "Aalo-X (sodium-cooled, 10 MWe design)",
      "design_family": "SFR",
      "developer": "Aalo Atomics",
      "developer_country_iso3": "USA",
      "site_name": "Idaho National Laboratory, Idaho",
      "site_country_iso3": "USA",
      "lat": 43.52,
      "lon": -112.95,
      "capacity_mwe_per_module": 10,
      "modules_planned": 1,
      "capacity_mwe_total": 10,
      "status": "operating",
      "regulator": "DOE (Reactor Pilot Program authorisation)",
      "regulator_stage": "DSA approved 2026-04; zero-power fuelled criticality early 2026-07-04 — fourth RPP criticality, meeting the July 4 goal",
      "key_milestone_date": "2026-07-04",
      "target_operation_year": 2026,
      "fuel": "LEU",
      "fuel_enrichment_pct": null,
      "customer_or_offtaker": "Aalo Atomics (demonstration; data-centre product Aalo Pod)",
      "is_floating": false,
      "use_case": "research",
      "source_url": "https://www.energy.gov/articles/department-energy-celebrates-fourth-criticality-ahead-july-4th-goal",
      "source_name": "DOE 2026-07-06 + Neutron Bytes 2026-07-08",
      "as_of_date": "2026-10-09",
      "confidence": "medium",
      "notes": "Zero-power demonstration; full-power operation not reported. Fuel LEU per ANS. Coordinates: INL centroid, approximate."
    },
    {
      "project_id": "radiant-kaleidos-dome-inl",
      "design": "Radiant Kaleidos (helium-cooled microreactor, ~1 MWe / 3 MWt)",
      "design_family": "microreactor",
      "developer": "Radiant Industries",
      "developer_country_iso3": "USA",
      "site_name": "NRIC DOME test bed, Idaho National Laboratory, Idaho",
      "site_country_iso3": "USA",
      "lat": 43.52,
      "lon": -112.95,
      "capacity_mwe_per_module": 1,
      "modules_planned": 1,
      "capacity_mwe_total": 1,
      "status": "under_construction",
      "regulator": "DOE (Reactor Pilot Program authorisation)",
      "regulator_stage": "PDSA approved 2026-02; first fuel tranche received 2026-07-01; five-phase test campaign (zero-power criticality then full power) planned summer 2026 — criticality not confirmed in sources reviewed",
      "key_milestone_date": "2026-07-01",
      "target_operation_year": 2026,
      "fuel": "TRISO-HALEU",
      "fuel_enrichment_pct": null,
      "customer_or_offtaker": "Radiant (customer deployments targeted 2028)",
      "is_floating": false,
      "use_case": "research",
      "source_url": "https://www.ans.org/news/article-8178/the-deadline-arrives-checking-in-on-the-reactor-pilot-program/",
      "source_name": "ANS Nuclear News 2026-07-02 (RPP status) + DOE releases",
      "as_of_date": "2026-10-09",
      "confidence": "medium",
      "notes": "TRISO HALEU fuel fabricated by Standard Nuclear (ANS). Status 'under_construction' = installed at DOME awaiting fuel load/criticality. Coordinates: INL centroid, approximate."
    },
    {
      "project_id": "deep-fission-gravity-parsons",
      "design": "Deep Fission Gravity (borehole PWR, 15 MWe)",
      "design_family": "microreactor",
      "developer": "Deep Fission",
      "developer_country_iso3": "USA",
      "site_name": "Parsons, Kansas (underground borehole ~1 mile deep)",
      "site_country_iso3": "USA",
      "lat": 37.34,
      "lon": -95.261,
      "capacity_mwe_per_module": 15,
      "modules_planned": 1,
      "capacity_mwe_total": 15,
      "status": "under_construction",
      "regulator": "DOE (Reactor Pilot Program)",
      "regulator_stage": "Groundbreaking 2025-12; 6,000-ft test well drilled; DOE safety approvals not reported as of 2026-07-02",
      "key_milestone_date": "2025-12-01",
      "target_operation_year": 2027,
      "fuel": "LEU",
      "fuel_enrichment_pct": null,
      "customer_or_offtaker": "Deep Fission (demonstration)",
      "is_floating": false,
      "use_case": "research",
      "source_url": "https://www.ans.org/news/article-8178/the-deadline-arrives-checking-in-on-the-reactor-pilot-program/",
      "source_name": "ANS Nuclear News 2026-07-02 (RPP status) + DOE releases",
      "as_of_date": "2026-10-09",
      "confidence": "low",
      "notes": "Full-power operations targeted H1 2027; initial criticality date not stated. PWR fuel (LEU assumed from reactor type, enrichment not stated). Coordinates: Parsons city-level."
    },
    {
      "project_id": "oklo-isotopes-groves-lockhart",
      "design": "Groves Isotope Test Reactor (15 MWt pool-type, ex-Atomic Alchemy)",
      "design_family": "microreactor",
      "developer": "Oklo Isotopes (formerly Atomic Alchemy)",
      "developer_country_iso3": "USA",
      "site_name": "Lockhart, Texas",
      "site_country_iso3": "USA",
      "lat": 29.885,
      "lon": -97.67,
      "capacity_mwe_per_module": 0,
      "modules_planned": 1,
      "capacity_mwe_total": 0,
      "status": "licensed",
      "regulator": "DOE (Reactor Pilot Program authorisation)",
      "regulator_stage": "DOE DSA secured week of 2026-07-02; criticality planned July 2026 (achievement not confirmed in sources reviewed)",
      "key_milestone_date": "2026-07-02",
      "target_operation_year": 2026,
      "fuel": "LEU",
      "fuel_enrichment_pct": null,
      "customer_or_offtaker": "Oklo Isotopes (radioisotope production)",
      "is_floating": false,
      "use_case": "research",
      "source_url": "https://www.ans.org/news/article-8178/the-deadline-arrives-checking-in-on-the-reactor-pilot-program/",
      "source_name": "ANS Nuclear News 2026-07-02 (RPP status) + DOE releases",
      "as_of_date": "2026-10-09",
      "confidence": "low",
      "notes": "Non-power isotope test reactor (0 MWe). Whether criticality occurred after July 2 2026 is a known gap. Coordinates: Lockhart city-level."
    },
    {
      "project_id": "natura-msr-1-abilene",
      "design": "Natura Resources MSR-1 (1 MWt molten salt research reactor)",
      "design_family": "MSR",
      "developer": "Natura Resources",
      "developer_country_iso3": "USA",
      "site_name": "Abilene Christian University (NEXT Lab/SERC), Abilene, Texas",
      "site_country_iso3": "USA",
      "lat": 32.47,
      "lon": -99.71,
      "capacity_mwe_per_module": 0,
      "modules_planned": 1,
      "capacity_mwe_total": 0,
      "status": "licensed",
      "regulator": "NRC (construction permit held by ACU) / DOE OTA",
      "regulator_stage": "NRC construction permit issued 2024-09 to ACU; DOE Reactor Pilot Program OTA announced 2025-12; operating licence not yet applied for per sources reviewed",
      "key_milestone_date": "2025-12-01",
      "target_operation_year": null,
      "fuel": "other",
      "fuel_enrichment_pct": null,
      "customer_or_offtaker": "Abilene Christian University (research)",
      "is_floating": false,
      "use_case": "research",
      "source_url": "https://www.ans.org/news/article-8178/the-deadline-arrives-checking-in-on-the-reactor-pilot-program/",
      "source_name": "ANS Nuclear News 2026-07-02 (RPP status) + DOE releases",
      "as_of_date": "2026-10-09",
      "confidence": "medium",
      "notes": "Fluoride fuel salt; enrichment not stated in sources (Natura has described HALEU fuel salt — not verified today). Coordinates: ACU campus, approximate."
    },
    {
      "project_id": "steady-energy-ldr50-helsinki-pilot",
      "design": "Steady Energy LDR-50 (50 MWt district-heating reactor)",
      "design_family": "iPWR",
      "developer": "Steady Energy",
      "developer_country_iso3": "FIN",
      "site_name": "Pilot plant inside a decommissioned coal plant, Helsinki (exact plant not named in source)",
      "site_country_iso3": "FIN",
      "lat": 60.17,
      "lon": 24.94,
      "capacity_mwe_per_module": 0,
      "modules_planned": 1,
      "capacity_mwe_total": 0,
      "status": "pre_licensing",
      "regulator": "STUK",
      "regulator_stage": "STUK-led international joint early review closure report published 2026-07-06 (SSM, PAA, SÚJB, SNRIU participated) — not a licensing decision; documentation 'not yet sufficiently detailed' to launch formal licensing",
      "key_milestone_date": "2026-07-06",
      "target_operation_year": null,
      "fuel": "LEU",
      "fuel_enrichment_pct": null,
      "customer_or_offtaker": "Finnish municipal utilities (Kuopion Energia, Helen and others have cooperation/assessment agreements)",
      "is_floating": false,
      "use_case": "district_heating",
      "source_url": "https://smr.nucnet.org/news/finland-s-regulator-publishes-joint-early-review-of-steady-energy-small-modular-reactor-7-1-2026",
      "source_name": "NucNet SMR 2026-07-06",
      "as_of_date": "2026-10-09",
      "confidence": "medium",
      "notes": "Heat-only (0 MWe; 50 MWt per developer design, not stated in source). Pilot described as 'being built' in Helsinki; whether the pilot is nuclear or electrically heated is not stated. Coordinates: Helsinki city centroid (not site-level)."
    },
    {
      "project_id": "blykalla-sealer-norrsundet",
      "design": "Blykalla SEALER-55 (lead-cooled fast reactor) x6",
      "design_family": "LFR",
      "developer": "Blykalla",
      "developer_country_iso3": "SWE",
      "site_name": "Norrsundet, Gävle municipality",
      "site_country_iso3": "SWE",
      "lat": 60.933,
      "lon": 17.15,
      "capacity_mwe_per_module": 55,
      "modules_planned": 6,
      "capacity_mwe_total": 330,
      "status": "licence_application",
      "regulator": "Swedish Government / SSM / Land and Environment Court",
      "regulator_stage": "Application to the Swedish government for a six-reactor park submitted 2026-05-18 (announced); SSM and court processes to follow; second park application (up to 440 MW) reported Aug 2026",
      "key_milestone_date": "2026-05-18",
      "target_operation_year": null,
      "fuel": null,
      "fuel_enrichment_pct": null,
      "customer_or_offtaker": "Blykalla (merchant); Oklo partnership (2025)",
      "is_floating": false,
      "use_case": "grid",
      "source_url": "https://www.ans.org/news/2026-05-20/article-8057/blykalla-submits-application-for-sixsmr-site-in-sweden/",
      "source_name": "ANS 2026-05-20",
      "as_of_date": "2026-10-09",
      "confidence": "medium",
      "notes": "'Early 2030s' operation if approved (no year). Fuel type/enrichment not stated (SEALER design uses UO2 at >5% enrichment per developer literature — not verified today -> null). Coordinates: Norrsundet, approximate."
    },
    {
      "project_id": "copenhagen-atomics-psi-critical-experiment",
      "design": "Copenhagen Atomics thorium molten-salt critical experiment ('Onion Core')",
      "design_family": "MSR",
      "developer": "Copenhagen Atomics",
      "developer_country_iso3": "DNK",
      "site_name": "Paul Scherrer Institute, Villigen, Aargau",
      "site_country_iso3": "CHE",
      "lat": 47.536,
      "lon": 8.231,
      "capacity_mwe_per_module": 0,
      "modules_planned": 1,
      "capacity_mwe_total": 0,
      "status": "pre_licensing",
      "regulator": "ENSI",
      "regulator_stage": "Collaboration agreement with PSI signed July 2024 targeting a critical experiment in 2026; Swiss licensing status and 2026 execution not confirmed in sources reviewed",
      "key_milestone_date": "2024-07-03",
      "target_operation_year": 2026,
      "fuel": "other",
      "fuel_enrichment_pct": null,
      "customer_or_offtaker": "Copenhagen Atomics / PSI (research)",
      "is_floating": false,
      "use_case": "research",
      "source_url": "https://www.neimagazine.com/news/danish-swiss-partnership-to-launch-europes-first-thorium-molten-salt-reactor-test/",
      "source_name": "NEI 2024-07-03",
      "as_of_date": "2026-10-09",
      "confidence": "low",
      "notes": "Fuel: lithium-thorium-LEU fluoride salt. Whether the 2026 critical experiment has taken place is a known gap. Coordinates: PSI campus."
    },
    {
      "project_id": "saltfoss-cmsr-power-barge",
      "design": "Saltfoss (ex-Seaborg) Compact Molten Salt Reactor power barge",
      "design_family": "floating",
      "developer": "Saltfoss Energy (renamed from Seaborg Technologies, April 2025)",
      "developer_country_iso3": "DNK",
      "site_name": null,
      "site_country_iso3": "KOR",
      "lat": null,
      "lon": null,
      "capacity_mwe_per_module": 100,
      "modules_planned": null,
      "capacity_mwe_total": null,
      "status": "concept",
      "regulator": "none (pre-licensing engagement in South Korea reported)",
      "regulator_stage": "No licence application; first power barge hoped for H1 2030",
      "key_milestone_date": "2025-04-01",
      "target_operation_year": 2030,
      "fuel": "LEU",
      "fuel_enrichment_pct": null,
      "customer_or_offtaker": "None firm (Samsung Heavy Industries barge partnership; Norsk Kjernekraft study)",
      "is_floating": true,
      "use_case": "grid",
      "source_url": "https://en.wikipedia.org/wiki/Saltfoss_Energy",
      "source_name": "Wikipedia (Saltfoss Energy) — tertiary",
      "as_of_date": "2026-10-09",
      "confidence": "low",
      "notes": "Tertiary source only; 2025-2026 funding/licensing status not verified. Switched first-generation design from HALEU to LEU (2023)."
    },
    {
      "project_id": "thorizon-one-borssele",
      "design": "Thorizon One (250 MWt / 100 MWe MSR)",
      "design_family": "MSR",
      "developer": "Thorizon",
      "developer_country_iso3": "NLD",
      "site_name": "Borssele site, Zeeland (pre-feasibility validated)",
      "site_country_iso3": "NLD",
      "lat": 51.431,
      "lon": 3.718,
      "capacity_mwe_per_module": 100,
      "modules_planned": 1,
      "capacity_mwe_total": 100,
      "status": "pre_licensing",
      "regulator": "ANVS",
      "regulator_stage": "MoU (Thorizon, EPZ, NRG-Pallas, provinces, Invest-NL) signed 2026-04-17 setting construction target 2034; no licence application",
      "key_milestone_date": "2026-04-17",
      "target_operation_year": null,
      "fuel": "other",
      "fuel_enrichment_pct": null,
      "customer_or_offtaker": "EPZ (investigating owner/operator role)",
      "is_floating": false,
      "use_case": "grid",
      "source_url": "https://world-nuclear-news.org/articles/dutch-agreement-paves-way-for-construction-of-commercial-msr",
      "source_name": "WNN 2026-04-17",
      "as_of_date": "2026-10-09",
      "confidence": "medium",
      "notes": "Fuel: cartridges of molten salt combining long-lived actinides from reprocessed used fuel with thorium. Companion 'Thorizon Pioneer' non-commercial demonstrator planned at Petten (NRG-Pallas owner/licensee, construction by 2028) — recorded separately. Coordinates: Borssele NPP."
    },
    {
      "project_id": "thorizon-pioneer-petten",
      "design": "Thorizon Pioneer (non-power MSR demonstrator)",
      "design_family": "MSR",
      "developer": "Thorizon",
      "developer_country_iso3": "NLD",
      "site_name": "NRG-Pallas Energy & Health Campus, Petten, North Holland",
      "site_country_iso3": "NLD",
      "lat": 52.785,
      "lon": 4.675,
      "capacity_mwe_per_module": 0,
      "modules_planned": 1,
      "capacity_mwe_total": 0,
      "status": "pre_licensing",
      "regulator": "ANVS",
      "regulator_stage": "MoU 2026-04-17 targets construction by 2028; NRG-Pallas to be owner, licensee and operator; no licence application",
      "key_milestone_date": "2026-04-17",
      "target_operation_year": null,
      "fuel": "other",
      "fuel_enrichment_pct": null,
      "customer_or_offtaker": "NRG-Pallas (research)",
      "is_floating": false,
      "use_case": "research",
      "source_url": "https://world-nuclear-news.org/articles/dutch-agreement-paves-way-for-construction-of-commercial-msr",
      "source_name": "WNN 2026-04-17",
      "as_of_date": "2026-10-09",
      "confidence": "medium",
      "notes": "Core-validation demonstrator without electricity production. Coordinates: Petten research site."
    },
    {
      "project_id": "nuward-edf",
      "design": "EDF Nuward (redesigned; 2x170 MWe reference)",
      "design_family": "iPWR",
      "developer": "Nuward (EDF subsidiary)",
      "developer_country_iso3": "FRA",
      "site_name": null,
      "site_country_iso3": "FRA",
      "lat": null,
      "lon": null,
      "capacity_mwe_per_module": 170,
      "modules_planned": 2,
      "capacity_mwe_total": 340,
      "status": "concept",
      "regulator": "ASNR",
      "regulator_stage": "Design relaunched with proven technologies after 2024 pause; conceptual design due mid-2026, detailed design 2031; no licensing application",
      "key_milestone_date": "2026-04-21",
      "target_operation_year": null,
      "fuel": "LEU",
      "fuel_enrichment_pct": null,
      "customer_or_offtaker": "None firm; first fleet of 3-4 reactors envisaged in one or two European countries",
      "is_floating": false,
      "use_case": "grid",
      "source_url": "https://www.nucnet.org/news/after-optimisation-delay-france-s-nuward-targets-new-conceptual-smr-design-this-year-4-2-2026",
      "source_name": "NucNet 2026-04-21",
      "as_of_date": "2026-10-09",
      "confidence": "medium",
      "notes": "EDF announced in July 2024 it would simplify the design using existing technologies (WNN 'EDF to modify Nuward design'); whether the 2x170 MWe configuration survives the redesign is not confirmed."
    },
    {
      "project_id": "thorcon-tmsr-500-kelasa",
      "design": "ThorCon TMSR-500 (shipyard-built molten salt plant)",
      "design_family": "MSR",
      "developer": "ThorCon International",
      "developer_country_iso3": "USA",
      "site_name": "Kelasa Island, Bangka Belitung",
      "site_country_iso3": "IDN",
      "lat": null,
      "lon": null,
      "capacity_mwe_per_module": 250,
      "modules_planned": 2,
      "capacity_mwe_total": 500,
      "status": "pre_licensing",
      "regulator": "BAPETEN",
      "regulator_stage": "BAPETEN approved site evaluation plan and site evaluation management system plan (reported 2025-08-06) — first licensing step; no construction licence",
      "key_milestone_date": "2025-08-06",
      "target_operation_year": null,
      "fuel": "other",
      "fuel_enrichment_pct": null,
      "customer_or_offtaker": "ThorCon / PLN (prospective)",
      "is_floating": false,
      "use_case": "grid",
      "source_url": "https://www.ans.org/news/2025-08-06/article-7260/thorcon-project-takes-forward-step-in-indonesia/",
      "source_name": "ANS 2025-08-06",
      "as_of_date": "2026-10-09",
      "confidence": "low",
      "notes": "Hull-type plant built in shipyard, installed at shore (not free-floating). 2x250 MWe configuration and fuel (LEU + thorium fluoride salt) from developer literature, not verified today. Site coordinates not verified -> null."
    },
    {
      "project_id": "philippines-mgen-smr-roadmap",
      "design": "Undetermined US SMR design (USTDA-funded review)",
      "design_family": "iPWR",
      "developer": "Meralco PowerGen (MGEN) with US vendors TBD",
      "developer_country_iso3": "PHL",
      "site_name": null,
      "site_country_iso3": "PHL",
      "lat": null,
      "lon": null,
      "capacity_mwe_per_module": null,
      "modules_planned": null,
      "capacity_mwe_total": null,
      "status": "concept",
      "regulator": "PNRI / PhilATOM",
      "regulator_stage": "USTDA USD 2.7m technical assistance to MGEN for SMR design review and roadmap announced 2026-02-16; DOE circular grants first NPP priority dispatch",
      "key_milestone_date": "2026-02-16",
      "target_operation_year": 2032,
      "fuel": null,
      "fuel_enrichment_pct": null,
      "customer_or_offtaker": "Meralco PowerGen",
      "is_floating": false,
      "use_case": "grid",
      "source_url": "https://www.world-nuclear-news.org/articles/us-touts-smr-designs-to-the-philippines",
      "source_name": "WNN 2026-02-17",
      "as_of_date": "2026-10-09",
      "confidence": "low",
      "notes": "National target 1,200 MW nuclear by 2032 (not SMR-specific). design_family placeholder; no design chosen."
    },
    {
      "project_id": "kenya-smr-plans",
      "design": "Undetermined (100-300 MW SMR options under study)",
      "design_family": "iPWR",
      "developer": "Nuclear Power and Energy Agency (Kenya)",
      "developer_country_iso3": "KEN",
      "site_name": null,
      "site_country_iso3": "KEN",
      "lat": null,
      "lon": null,
      "capacity_mwe_per_module": null,
      "modules_planned": null,
      "capacity_mwe_total": null,
      "status": "concept",
      "regulator": "KNRA",
      "regulator_stage": "No licence application; groundbreaking for first NPP targeted by March 2027, commissioning 2034 (CNNC MoU March 2025)",
      "key_milestone_date": "2025-03-01",
      "target_operation_year": 2034,
      "fuel": null,
      "fuel_enrichment_pct": null,
      "customer_or_offtaker": "Government of Kenya",
      "is_floating": false,
      "use_case": "grid",
      "source_url": "https://energyforgrowth.org/article/2026-update-who-in-africa-is-ready-for-nuclear-power/",
      "source_name": "Energy for Growth Hub 2026-09-17",
      "as_of_date": "2026-10-09",
      "confidence": "low",
      "notes": "Kenya's primary plan is a large reactor (Kilifi/Kwale region); SMR interest is at funding-model stage. design_family placeholder."
    }
  ]
}