Nuclear Atlas
Weekly digest
Companies · Nuclear, fuel and SMR · data

Électricité de France SA (EDF)

EDFUtility, fleet ownerState-owned, unlistedHQ Paris, France

Profile

EDF, fully owned by the French state since its 2023 delisting, operates the world's largest single nuclear fleet: 57 operating units with 63,000 MWe net across 18 French sites per the reactor dataset (including Flamanville 3, the first EPR). Through EDF Energy it also operates the UK's 9 remaining reactors (5,883 MWe net) and is building Hinkley Point C (2 EPR units) with Sizewell C to follow. EDF owns Framatome (reactor vendor and fuel fabricator) and the SMR subsidiary Nuward, whose redesign is targeting a new conceptual design in 2026 (NucNet 21 Apr 2026). Included as an unlisted state entity; no market data apply.

Source: data/reactors.csv (WNA/PRIS); data/smr_projects.csv (NucNet 21 Apr 2026); edf.fr (not fetched this run), 9 Oct 2026 · confidence medium

Fleet

Reactors operated
57
Net capacity
63,000 MWe
As of
9 Oct 2026

French fleet only; the 9 UK units (5,883 MWe) operated by EDF Energy are listed in key_projects but excluded from the count to keep it comparable with national statistics.

Source: data/reactors.csv (WNA Reactor Database / IAEA PRIS as republished by WNA, as of 9 Oct 2026); operating units summed per operator/site

Key projects

Key projects from the company record; a map link appears where the project id is in a map dataset.
ProjectCountryStageNoteMap
BellevilleFRAOperating2 operating units, 2,620 MWe netopen on the map
BlayaisFRAOperating4 operating units, 3,640 MWe netopen on the map
BugeyFRAOperating4 operating units, 3,580 MWe netopen on the map
CattenomFRAOperating4 operating units, 5,200 MWe netopen on the map
ChinonFRAOperating4 operating units, 3,620 MWe netopen on the map
ChoozFRAOperating2 operating units, 3,000 MWe netopen on the map
CivauxFRAOperating2 operating units, 2,990 MWe netopen on the map
CruasFRAOperating4 operating units, 3,660 MWe netopen on the map
DampierreFRAOperating4 operating units, 3,560 MWe netopen on the map
FlamanvilleFRAOperating3 operating units, 4,290 MWe netopen on the map
GolfechFRAOperating2 operating units, 2,620 MWe netopen on the map
GravelinesFRAOperating6 operating units, 5,460 MWe netopen on the map
NogentFRAOperating2 operating units, 2,620 MWe netopen on the map
PaluelFRAOperating4 operating units, 5,320 MWe netopen on the map
PenlyFRAOperating2 operating units, 2,660 MWe netopen on the map
St. AlbanFRAOperating2 operating units, 2,670 MWe netopen on the map
St. LaurentFRAOperating2 operating units, 1,830 MWe netopen on the map
TricastinFRAOperating4 operating units, 3,660 MWe netopen on the map
Hartlepool [EDF Energy]GBROperating2 operating units, 1,185 MWe netopen on the map
Heysham [EDF Energy]GBROperating4 operating units, 2,300 MWe netopen on the map
Sizewell [EDF Energy]GBROperating1 operating unit, 1,198 MWe netopen on the map
Torness [EDF Energy]GBROperating2 operating units, 1,200 MWe netopen on the map
Hinkley PointGBRUnder construction2 under construction; Hinkley Point C units 1-2 under construction (EDF Energy / CGN minority)open on the map
EDF Nuward (redesigned; 2x170 MWe reference)FRAConceptRegulator stage as of 9 Oct 2026: Design relaunched with proven technologies after 2024 pause; conceptual design due mid-2026, detailed design 2031; no licensing applicationopen on the map

Deals

Deals naming this company, newest first; each title links to its source. All deals.
DateTypeDealStatusCapacity MWValue
26 Aug 2026New buildNetherlands' NEO NL awards FEED study contracts to EDF (EPR) and Westinghouse (AP1000) for two new reactorsSignedn/an/a
18 Dec 2025New buildEDF puts EPR2 programme (six units) at EUR 72.8 billion; FID expected late 2026, Penly 1 in 2038Pending9,90072.8 bn EUR
14 Dec 2025New buildEDF's Flamanville 3 EPR reaches 100% power for the first time (14 December 2025)Completed1,66923.7 bn EUR
15 Sep 2025PolicyUK and US announce Atlantic Partnership for Advanced Nuclear Energy ahead of Trump state visitSignedn/an/a
22 Jul 2025FinancingUK takes final investment decision on Sizewell C (3.2 GW EPR) at ~GBP 38 billionSigned3,20038.0 bn GBP
21 Dec 2024New buildFlamanville 3 EPR connected to the French grid for the first time, 17 years after construction beganCompleted1,669n/a
23 Jan 2024New buildEDF delays Hinkley Point C unit 1 to 2029-2031 and raises cost to GBP 31-35 billionPending3,26035.0 bn GBP
Source: deals.json, as of 9 Oct 2026; values as stated by each source, not converted.

Documents

Documents captured on the record: the latest documents and, where present, the technical report.
DocumentTypeDate
NucNet: France's Nuward targets new conceptual SMR design this yearNews21 Apr 2026

Chart

TradingView symbol: n/a · state-owned, unlisted
Market cap, USD
n/a · state-owned, unlisted
Market cap, local
n/a · state-owned, unlisted
Chart: none. No TradingView symbol is on the record (state-owned, unlisted); the dated snapshot is all this page shows.

All companies · All deals