Spent fuel and waste
What spent fuel is, how much there is, how it is stored, where the repositories stand, what reprocessing and fast reactors change, and how half-lives work.
What spent fuel is
Typical used LWR fuel at discharge is, by mass, about 95.6% uranium, 2.9% stable fission products, 0.9% plutonium, 0.3% caesium and strontium, 0.1% iodine and technetium, 0.1% other long-lived fission products and 0.1% minor actinides. Fission products are the lighter fragments left when a nucleus splits.
Sources: WNA - Processing of Used Nuclear Fuel, 23 Aug 2024 (wa_spent_fuel_composition) · WNA - Physics of Nuclear Energy, 30 Mar 2026 (fi_what_is_fission)In a typical LWR, fuel leaves the reactor after roughly three years in the core: about one-third of it is replaced at each refuelling every 12 to 18 months, and some plants run 24-month cycles. Burn-up, the energy extracted per tonne of uranium, has risen from about 40 GWd/tU to over 60 GWd/tU for the best fuel; about 50 GWd/t is typical in the USA.
Sources: WNA - Nuclear Fuel Cycle Overview, 23 Sep 2025 (fi_refuelling_cycle) · WNA - Fuel Fabrication, 4 Aug 2026 (fi_burnup_typical)How much there is
In WNA's material balance for a typical 1,000 MWe LWR, about 27.6 t of used fuel a year is discharged at 4.5% enrichment, containing about 280 kg of transuranics, mainly plutonium; at 5% enrichment it is about 19.1 t.
Source: WNA - Nuclear Fuel Cycle Overview, 23 Sep 2025 (wa_1000mwe_annual_spent_fuel)About 430,000 t of spent fuel has been discharged worldwide, around 30% of it reprocessed, and about 263,000 t is in storage (IAEA figures as quoted by WNA; WNA's older reprocessing page gives about 400,000 t discharged). High-level waste accounts for 3% of the volume and 95% of the total radioactivity of all radioactive waste produced.
Source: WNA - Radioactive Waste Management, 22 Nov 2025 (wa_world_inventory, wa_hlw_share)In October 2022 the US DOE put the spent fuel generated by US commercial reactors since the 1950s at about 90,000 metric tons, enough, if stacked together, to fit on a single football field at a depth of less than 10 yards; the reactors add about 2,000 metric tons a year, and the fuel is stored at more than 70 sites in 35 states. The same DOE page states that more than 90% of the potential energy in nuclear fuel remains after five years of use in a reactor, and that the US does not recycle spent fuel while France does.
Source: US DOE Office of Nuclear Energy - 5 Fast Facts about Spent Nuclear Fuel, 3 Oct 2022 (wa_us_inventory_doe, mu_football_field, mu_spent_fuel_energy)Decay: why disposal waits
After 40 to 50 years of storage the heat and radioactivity of high-level waste have fallen by over 99%, which is the technical reason for delaying final disposal for several decades.
Source: WNA - Radioactive Waste Management, 22 Nov 2025 (wa_decay_40_50_years)Reprocessing used fuel and removing the plutonium and uranium leaves high-level waste that decays to the radioactivity level of the original uranium ore within about 9,000 years, compared with about 300,000 years for unreprocessed used fuel.
Source: WNA - Radioactive Waste Management, 22 Nov 2025 (wa_ore_level_time)Storage: pool, then dry cask
Used fuel is first cooled in water pools for at least five years and can then be moved to dry casks holding about 40 assemblies each, with up to about 45 kW of decay heat per cask. In the pool the assemblies stand under water.
Source: WNA - Radioactive Waste Management, 22 Nov 2025 (wa_pool_then_dry)More than 25,000 shipments of used nuclear fuel have been made since 1971 without any release of radioactivity.
Source: WNA - Transport of Radioactive Materials, 16 Aug 2026 (mu_transport_record)Repositories: where each country stands
Finland's Onkalo repository at Olkiluoto will be the world's first industrial-scale final disposal facility for spent fuel. On 10 August 2026 the regulator STUK concluded there is no obstacle to granting Posiva an operating licence, and a government decision proposal was expected in autumn 2026. Posiva's goal is operational readiness for the start of disposal by the end of 2026, and it seeks a licence through 2070. The construction licence dates from November 2015 and the operating licence application from December 2021; the fuel goes into copper canisters at about 400 to 430 m depth. In the sources read in October 2026, no disposal had started.
Source: ANS Nuclear Newswire - Onkalo SNF repository passes safety assessment, 10 Aug 2026 (wa_onkalo_status)Sweden's government approved SKB's spent fuel repository at Forsmark and the encapsulation plant at Oskarshamn on 27 January 2022. The Land and Environment Court granted permission in October 2024 and ground was broken on 15 January 2025. Construction will take about ten years before disposal of some 12,000 t of fuel in about 6,000 copper canisters at about 500 m depth can begin in the 2030s.
Source: SKB - The Government approves SKB's final repository system, 27 Jan 2022 (wa_forsmark_status)France's Cigeo deep repository near Bure, in the Meuse/Haute-Marne clay about 500 m down, is to hold about 83,000 m³ of waste: about 10,000 m³ high-level and 73,000 m³ long-lived intermediate-level. Andra applied for the construction licence in January 2023; ASNR issued a favourable opinion announced on 4 December 2025; a public inquiry is scheduled for the second half of 2026; the authorisation decree is expected in late 2027 or early 2028, and the first waste packages are planned for 2050.
Source: WNN - Regulator approves safety case for French repository, 8 Dec 2025 (wa_cigeo_status)Switzerland's Nagra submitted the general licence applications for a deep geological repository at Nördlich Lägern, with the surface facility in Stadel in Canton Zurich, and for an encapsulation plant at Würenlingen to the Swiss Federal Office of Energy on 19 November 2024; the cantons plan to submit their statements in autumn 2027. WNA's storage page gives the later steps as a Federal Council decision around 2029, Parliament around 2030, a possible referendum in 2031 and commissioning around 2050.
Source: Kanton Zürich - Medienmitteilung: Geologisches Tiefenlager und Brennelemente-Verpackungsanlage (Rahmenbewilligungsgesuche eingereicht), 19 Nov 2024 (wa_nagra_status)The US Yucca Mountain repository licence application was filed in June 2008, but the project has been suspended (status per WNA's storage page of 26 March 2026). Two consolidated interim storage facilities were licensed by the NRC: Interim Storage Partners in Texas in September 2021 and Holtec's HI-STORE in New Mexico in May 2023, for 8,680 tU. Holtec cancelled HI-STORE in 2025, and the US Supreme Court ruled on the Texas licence in June 2025.
Source: WNA - Storage and Disposal of Radioactive Waste, 26 Mar 2026 (wa_yucca_status, wa_us_interim_storage)| Country | Site | Status, in sources read by 9 Oct 2026 | Source |
|---|---|---|---|
| Finland | Onkalo, Olkiluoto | Regulator found no obstacle to an operating licence; readiness for disposal targeted by the end of 2026 | ANS Nuclear Newswire10 Aug 2026wa_onkalo_status |
| Sweden | Forsmark (encapsulation plant at Oskarshamn) | Approved by the government; ground broken; disposal can begin in the 2030s | SKB27 Jan 2022wa_forsmark_status |
| France | Cigeo, near Bure | Construction licence applied for; favourable regulator opinion; first packages planned for 2050 | WNN8 Dec 2025wa_cigeo_status |
| Switzerland | Nördlich Lägern (surface facility in Stadel) | General licence applications submitted; cantons plan to submit statements in autumn 2027 | Kanton Zürich19 Nov 2024wa_nagra_status |
| USA | Yucca Mountain | Licence application filed; project suspended | WNA26 Mar 2026wa_yucca_status |
| USA | Interim Storage Partners, Texas; HI-STORE, New Mexico | Both licensed by the NRC; HI-STORE cancelled; Supreme Court ruling on the Texas licence | WNA26 Mar 2026wa_us_interim_storage |
Status in a few words from each cited fact, as it stood in the sources read for the fact base; the Source column gives the citation and its own date. Nothing here is from a dataset.
Reprocessing and fast reactors
Commercial reprocessing capacity is about 1,700 t/yr at La Hague (France), 800 t/yr design capacity at Rokkasho (Japan) and 400 t/yr at Mayak RT-1 (Russia). About 30% of all used fuel has been reprocessed, and MOX fabrication capacity is about 480 t/yr.
Source: WNA - Processing of Used Nuclear Fuel, 23 Aug 2024 (wa_reprocessing_capacities)Fast neutron reactors can burn the long-lived actinides recovered from used fuel; reactors designed to produce more plutonium than they consume are fast breeder reactors. Fast reactors have no moderator and use a liquid-metal coolant, normally sodium, at around 500 to 550 °C and near-atmospheric pressure; they can breed plutonium from U-238 or burn long-lived actinides, extracting about 60 times more energy from uranium than a conventional reactor. The reactor families page places them among the other designs.
Source: WNA - Fast Neutron Reactors, 31 Mar 2026 (wa_fast_reactors_actinides, rf_fast_reactors)Half-lives
The ENSDF adopted half-lives of six isotopes that matter in spent fuel:
- Iodine-131: 8.0252 days
- Strontium-90: 28.91 years
- Caesium-137: 30.08 years
- Plutonium-239: 24,110 years
- Uranium-235: 7.04 × 108 years (704 million years)
- Uranium-238: 4.468 × 109 years (about 4.47 billion years, roughly the age of the Earth)
Fraction remaining against time, from each isotope's half-life
The author's view
Read next
The uranium journey's pool stage follows the fuel out of the reactor into the pool, the cask and the repository, with the mass balance for one tonne of ore. How fission works explains what happens to the fuel before it is spent.
Facts on this page
29 verified facts from the explainer fact base (docs/explainers/FACTS.md); each id links to the page that was read. Nothing from the "could not verify" list appears on this page.
Used LWR fuel is about 95.6% uranium, 2.9% stable fission products, 0.9% plutonium, 0.3% caesium and strontium, 0.1% iodine and technetium, 0.1% other long-lived fission products and 0.1% minor actinides.
WNA - Processing of Used Nuclear Fuel, 23 Aug 2024 · typical LWR fuel at discharge· reputable secondaryNuclear fission occurs when a uranium-235 nucleus absorbs a neutron and splits into two lighter fragments, releasing about 200 MeV of energy and, on average, 2.45 further neutrons that can sustain a chain reaction.
WNA - Physics of Nuclear Energy, 30 Mar 2026 · U-235 thermal fission· reputable secondaryAbout one-third of the fuel is replaced at each refuelling every 12 to 18 months (some plants run 24-month cycles), so an assembly spends roughly three years (18-36 months of cycles) in the core.
WNA - Nuclear Fuel Cycle Overview, 23 Sep 2025 · typical LWR· reputable secondaryFuel burn-up - the energy extracted per tonne of uranium - has risen from about 40 GWd/tU to over 60 GWd/tU for the best fuel; about 50 GWd/t is typical in the USA.
WNA - Fuel Fabrication, 4 Aug 2026 · LWR· reputable secondaryA 1,000 MWe reactor discharges about 27.6 t of used fuel a year (containing about 280 kg of transuranics, mainly plutonium) when fuelled at 4.5% enrichment, or about 19.1 t at 5%.
WNA - Nuclear Fuel Cycle Overview, 23 Sep 2025 · WNA material balance, typical 1,000 MWe LWR· reputable secondaryAbout 430,000 t of spent fuel has been discharged worldwide, around 30% of it reprocessed, and about 263,000 t is in storage (IAEA figures as quoted by WNA).
WNA - Radioactive Waste Management, 22 Nov 2025 · cumulative, WNA page updated 22 Nov 2025· reputable secondaryDisagreement between sources: WNA's reprocessing page (23 Aug 2024) says about 400,000 t discharged; the IAEA figure quoted on the newer page is 430,000 t.US commercial reactors have generated about 90,000 metric tons of spent fuel since the 1950s - enough, if stacked together, to fit on a single football field at a depth of less than 10 yards - and add about 2,000 metric tons a year; it is stored at more than 70 sites in 35 states.
US DOE Office of Nuclear Energy - 5 Fast Facts about Spent Nuclear Fuel, 3 Oct 2022 · DOE Office of Nuclear Energy, 3 Oct 2022· primary sourceAll US commercial spent fuel ever produced (about 90,000 t) would fit on a single football field to a depth of less than 10 yards, according to the US Department of Energy.
US DOE Office of Nuclear Energy - 5 Fast Facts about Spent Nuclear Fuel, 3 Oct 2022 · DOE Office of Nuclear Energy· primary sourceMore than 90% of the potential energy in nuclear fuel remains after five years of use in a reactor; the US does not recycle spent fuel while France does.
US DOE Office of Nuclear Energy - 5 Fast Facts about Spent Nuclear Fuel, 3 Oct 2022 · DOE Office of Nuclear Energy· primary sourceAfter 40-50 years of storage the heat and radioactivity of high-level waste have fallen by over 99%, which is the technical reason for delaying final disposal for several decades.
WNA - Radioactive Waste Management, 22 Nov 2025· reputable secondaryReprocessing used fuel and removing the plutonium and uranium leaves high-level waste that decays to the radioactivity level of the original uranium ore within about 9,000 years, compared with about 300,000 years for unreprocessed used fuel.
WNA - Radioactive Waste Management, 22 Nov 2025 · WNA statement (not attributed to NEA on the page)· reputable secondaryUsed fuel is first cooled in water pools for at least five years and then can be moved to dry casks holding about 40 assemblies each with up to about 45 kW of decay heat.
WNA - Radioactive Waste Management, 22 Nov 2025· reputable secondaryMore than 25,000 shipments of used nuclear fuel have been made since 1971 without any release of radioactivity.
WNA - Transport of Radioactive Materials, 16 Aug 2026· reputable secondaryFinland's Onkalo repository at Olkiluoto will be the world's first industrial-scale final disposal facility for spent fuel: on 10 August 2026 regulator STUK concluded there is no obstacle to granting Posiva an operating licence, a government decision proposal was expected in autumn 2026, Posiva's goal is operational readiness for the start of disposal by the end of 2026, and it seeks a licence through 2070.
ANS Nuclear Newswire - Onkalo SNF repository passes safety assessment, 10 Aug 2026· reputable secondarySweden's Government approved SKB's spent fuel repository at Forsmark and encapsulation plant at Oskarshamn on 27 January 2022; the Land and Environment Court granted permission in October 2024, ground was broken on 15 January 2025, and construction will take about ten years before disposal of some 12,000 t of fuel in about 6,000 copper canisters at about 500 m depth can begin in the 2030s.
SKB - The Government approves SKB's final repository system, 27 Jan 2022· primary sourceFrance's Cigeo deep repository near Bure (Meuse/Haute-Marne clay, about 500 m deep) is to hold about 83,000 m3 of waste (about 10,000 m3 high-level and 73,000 m3 long-lived intermediate-level); Andra applied for the construction licence in January 2023, ASNR issued a favourable opinion announced on 4 December 2025, a public inquiry is scheduled for the second half of 2026, the authorisation decree is expected in late 2027/early 2028 and first waste packages are planned for 2050.
WNN - Regulator approves safety case for French repository, 8 Dec 2025· reputable secondarySwitzerland's Nagra submitted the general licence applications for a deep geological repository at Nördlich Lägern (surface facility in Stadel, Canton Zurich) and an encapsulation plant at Würenlingen to the Swiss Federal Office of Energy on 19 November 2024; the cantons plan to submit their statements in autumn 2027.
Kanton Zürich - Medienmitteilung: Geologisches Tiefenlager und Brennelemente-Verpackungsanlage (Rahmenbewilligungsgesuche eingereicht), 19 Nov 2024· primary sourceThe US Yucca Mountain repository licence application was filed in June 2008 but the project has been suspended.
WNA - Storage and Disposal of Radioactive Waste, 26 Mar 2026 · status per WNA storage page 26 Mar 2026· reputable secondaryTwo consolidated interim storage facilities were licensed by the NRC - Interim Storage Partners in Texas (September 2021) and Holtec's HI-STORE in New Mexico (May 2023, 8,680 tU); Holtec cancelled HI-STORE in 2025 and the US Supreme Court ruled on the Texas licence in June 2025.
WNA - Storage and Disposal of Radioactive Waste, 26 Mar 2026 · per WNA storage page 26 Mar 2026 (first-run fetch)· reputable secondaryCommercial reprocessing capacity is about 1,700 t/yr at La Hague (France), 800 t/yr design capacity at Rokkasho (Japan) and 400 t/yr at Mayak RT-1 (Russia); about 30% of all used fuel has been reprocessed and MOX fabrication capacity is about 480 t/yr.
WNA - Processing of Used Nuclear Fuel, 23 Aug 2024· reputable secondaryFast neutron reactors can burn the long-lived actinides recovered from used fuel, and reactors designed to produce more plutonium than they consume are fast breeder reactors.
WNA - Fast Neutron Reactors, 31 Mar 2026· reputable secondaryFast neutron reactors have no moderator and use a liquid-metal coolant (normally sodium) at around 500-550 C and near-atmospheric pressure; they can breed plutonium from U-238 or burn long-lived actinides, extracting about 60 times more energy from uranium than a conventional reactor.
WNA - Fast Neutron Reactors, 31 Mar 2026· reputable secondaryIodine-131 has a half-life of 8.0252 days.
NNDC NuDat 3 / ENSDF adopted levels - 131I, 17 Jul 2006 · ENSDF adopted value (uncertainty 0.0006)· primary sourceStrontium-90 has a half-life of 28.91 years.
NNDC NuDat 3 / ENSDF adopted levels - 90Sr, 1 Mar 2020 · ENSDF adopted value (uncertainty 0.03), evaluation 2020· primary sourceDisagreement between sources: The brief's 28.8 y is an older value; use 28.9 y (ENSDF 28.91).Caesium-137 has a half-life of 30.08 years.
NNDC NuDat 3 / ENSDF adopted levels - 137Cs, 1 Jan 2007 · ENSDF adopted value (uncertainty 0.09)· primary sourcePlutonium-239 has a half-life of 24,110 years.
NNDC NuDat 3 / ENSDF adopted levels - 239Pu, 1 Jan 2014 · ENSDF adopted value (uncertainty 30)· primary sourceUranium-235 has a half-life of 7.04 x 10^8 years (704 million years).
NNDC NuDat 3 / ENSDF adopted levels - 235U, 1 Feb 2014 · ENSDF adopted value· primary sourceUranium-238 has a half-life of 4.468 x 10^9 years (about 4.47 billion years, roughly the age of the Earth).
NNDC NuDat 3 / ENSDF adopted levels - 238U, 1 Jun 2014 · ENSDF adopted value (uncertainty 0.006e9)· primary source